Spalding M88724C1 manual Install nuts 25 onto the ground tube bolts as shown

Page 5

1.

Ensure ground is level with playing surface, then dig pole hole.

24" (61 cm)

WARNING!

GROUND SURFACE

24" (61 cm)

48" (121.9 cm)

PLAYING SURFACE

CONTACT UTILITIES BEFORE DIGGING.

48" (121.9 cm)

2. Install nuts (25) onto the ground tube bolts as shown.

25

2

NOTE:

Nuts on the top of the plate are used for leveling the pole after system is fully assembled.

5

08/06

ID# M88724C1

Image 5
Contents High End Residential In-Ground Basketball System Safety Instructions Parts List Hardware Identifier Bolts & Screws Install nuts 25 onto the ground tube bolts as shown Build drainage hill Side ViewPlaying Surface Shown Insert bushings 19 into areasMounting plate 2 as shown Playing SurfaceCompleted Assembly Lower yokes 17 & 18 to pole as shown While still in forward position, attach both upperLower yoke Attach elevator adjustment 12 toAttach elevator adjustment 12 to pole bracket Attach backboard 13 to upper and lower Using TWO people to hold the boardYokes 18 First attach board 13 to upper yokeShown Figure a Attach height indicators Apply height indicator labels 32 & 31 to height indicatorsInstall net 4 to rim as shown Screws 29 into place with a Phillips head screwdriverNing Remove cotter pin 9, and pull out pin 8. This will allow After pole has been secured to anchor plate 2 loosen nutAfter system is leveled, completely tighten all nuts Check system leveling. PoleShould be level in all directions Limited Lifetime Warranty