Spalding M88724C1 Apply height indicator labels 32 & 31 to height indicators, Shown by turning

Page 16

14.

A.

Apply height indicator labels (32 & 31) to height indicators (30).

Set-up For Left Side

30

10 9 8 7

10 9 8 7

32

Set-up For Right Side

30

7 8 9 10

7

8 9 10

31

 

B.

Attach height indicators to lower yoke in area shown by turning

screws (29) into place with a Phillips head screwdriver.

29

10

9

8 7

 

 

 

 

 

C

Attach height indicators

 

to lower yoke in area

 

shown by turning

 

screws (29) into place

 

with a Phillips head

 

screwdriver.

15.

Install net (4) to rim as shown.

1.

2.

3.

ID# M88724C1

08/06

16

IMPORTANT!

NOTE ORIENTATION

OF HEIGHT

INDICATORS:

10’ MARK SHOULD FACE AWAY FROM BACKBOARD.

 

 

10

7

8

9

29

 

 

 

4.

Image 16
Contents High End Residential In-Ground Basketball System Safety Instructions Parts List Hardware Identifier Bolts & Screws Install nuts 25 onto the ground tube bolts as shown Side View Build drainage hillPlaying Surface Insert bushings 19 into areas ShownPlaying Surface Mounting plate 2 as shownCompleted Assembly While still in forward position, attach both upper Lower yokes 17 & 18 to pole as shownAttach elevator adjustment 12 to Lower yokeAttach elevator adjustment 12 to pole bracket Using TWO people to hold the board Attach backboard 13 to upper and lowerYokes 18 First attach board 13 to upper yokeShown Figure a Apply height indicator labels 32 & 31 to height indicators Attach height indicatorsInstall net 4 to rim as shown Screws 29 into place with a Phillips head screwdriverNing After pole has been secured to anchor plate 2 loosen nut Remove cotter pin 9, and pull out pin 8. This will allowShould be level in all directions Check system leveling. PoleAfter system is leveled, completely tighten all nuts Limited Lifetime Warranty