24.Attach the Low Cable (53) to the
See the inset drawing. Do not overtighten the M8 Locknut (58); it should be threaded onto the end of the Low Cable (53} so that
only two threads are showing above the
Locknut.
24
i
58
25.Identify the High Cable (55). Route the High Cable upward through the Top Frame (4) and over a Thick Pulley (48).
Attach the Thick Pulley (48) inside the Top Frame (4) with an M10 x 67mm Bolt (71), two M10 Washers (57), two 13mm Spacers (52), and an M10 Locknut (56).
26.Route the High Cable (55) over a Thin Pulley
(47)and downward through the Top Frame (4).
Attach the Thin Pulley (47) inside the Top Frame (4) with an M10 x 67mm Bolt (71), an M10 Washer (57), and an 11mm Spacer (86). Make sure that the Thin Pulley does not fall out of the Top Frame while you complete steps 27 and 28.
25
484
2647
55
57
71
16