ADC AD-115ES installation manual Installation Procedures, Location Requirements

Page 12

SECTION III

INSTALLATION PROCEDURES

Installation should be performed by competent technicians in accordance with local and state codes. In the absence of these codes, the installation must conform to applicable American National Standards: ANSI Z223.1- LATEST EDITION (National Fuel Gas Code) or ANSI/NFPA NO. 70-LATEST EDITION (National Electrical Code) or in Canada, the installation must conform to applicable Canadian Standards: CAN/CGA-B149.1-M91 (Natural Gas) or CAN/CGA-B149.2-M91 (Liquid Propane [L.P.] Gas) or LATEST EDITION (for General Installation and Gas Plumbing) or Canadian Electrical Codes Parts 1 & 2 CSA C22.1-1990 or LATEST EDITION (for Electrical Connections).

A. LOCATION REQUIREMENTS

Before installing the dryer, be sure the location conforms to local codes and ordinances. In the absence of such codes or ordinances, the location must conform with the National Fuel Gas Code ANSI.Z223.1 LATEST EDITION, or in Canada, the installation must conform to applicable Canadian Standards: CAN/CGA-B149.1- M91 (Natural Gas) or CAN/CGA-B149.2-M91 (L.P. Gas) or LATEST EDITION (for General Installation and Gas Plumbing).

1.The dryer must be installed on a sound level floor capable of supporting its weight. Carpeting must be removed from the floor area that the dryer is to rest on.

IMPORTANT: “The dryer must be installed on noncombustible floors only.”

2.The dryer must not be installed or stored in an area where it will be exposed to water and/or weather.

3.This dryer is for use in noncombustible locations.

4.Provisions for adequate air supply must be provided as noted in this manual (refer to Fresh Air Supply Requirements in Section D).

5.Clearance provisions must be made from combustible construction as noted in this manual (refer to Dryer Enclosure Requirements in Section C).

6.Provisions must be made for adequate clearances for servicing and for operation as noted in this manual (refer to Dryer Enclosure Requirements in Section C).

7.The dryer must be installed with a proper exhaust duct connection to the outside as noted in this manual (refer to Exhaust Requirements in Section E).

8.Dryer must be located in an area where correct exhaust venting can be achieved as noted in this manual (refer to Exhaust Requirements in Section E).

IMPORTANT: Dryer should be located where a minimum amount of exhaust duct will be necessary.

9. The dryer must be installed with adequate clearance for air openings into the combustion chamber.

CAUTION: This dryer produces combustible lint and must be exhausted to the outdoors. Every 6 months, inspect the exhaust ducting and remove any lint buildup.

8

American Dryer Corp.

113202 - 10

Image 12
Contents AD-115ES Installation Manual Retain This Manual In a Safe Place For Future Reference For Your Safety Page Table of Contents Safety Precautions SectionStandard SPECIFICATIONS/COMPONENT Identification SpecificationsSpecifications Gas, Electric, and Steam Component Identification 113202 Installation Procedures Location RequirementsUnpacking and Setting UP American Dryer Corp 113202 This Exhaust Duct Transition Piece Must be Installed First Dryer Enclosure Requirements Fresh AIR Supply RequirementsExhaust Requirements General Exhaust Ductwork InformationAmerican Dryer Corp 113202 Outside Ductwork Protection American Dryer Corp 113202 Electrical Information Reversing, 3ø Motor Gas and Steam Reversing, 3ø Motor Electric American Dryer Corp 113202 GAS Information Type of GAS Type of GAS American Dryer Corp 113202 Operating Steam Pressure Steam InformationSteam Damper System Compressed Air Supply Air Pressure113202 Water Information Before YOU Start Check Local Codes and Permits113202 Typical Water Supply Preparation for Operation and START-UP Preoperational Test Basket Tumbler Coating Dual Timer Dryers Preoperational InstructionsReversing Timer SPIN/DWELL Adjustments Shutdown InstructionsSERVICE/PARTS Information ServiceParts Warranty Information Returning Warranty CardsWarranty Returning Warranty PartsAmerican Dryer Corp 113202 Routine Maintenance CleaningSuggested Cleaning Schedule Adjustments LubricationData Label Information Procedure for Functional Check Replacement Components 113202 Manual Reset Burner HI-LIMIT Instructions PhaseDual Timer 113202 ADC Part No 10 12/10/08