ADC AD-115ES installation manual Water Information, Before YOU Start Check Local Codes and Permits

Page 32

6.Steam Damper Air Piston (Air Control) Operation Adjustment

Although the damper operation was tested and adjusted prior to shipping at 80 psi (5.51 bar), steam damper operation must be checked before the dryer is put into operation. Refer to page 33 for instructions to check steam damper system operation. If damper air adjustment is necessary, locate the flow-control valve and make the necessary adjustments as noted below.

I. WATER INFORMATION

BEFORE YOU START!

CHECK LOCAL CODES AND PERMITS

Call your local water company or the proper municipal authority for information regarding local codes.

IMPORTANT: It is your responsibility to have ALL plumbing connections made by a qualified professional to assure that the plumbing installation is adequate and conforms to local, state, and federal regulations or codes.

IMPORTANT: It is the installer’s or owner’s responsibility to see that the necessary or required water, water pressure, pipe size, or connections are provided. The manufacturer assumes no responsibility if the fire suppression system is not connected, installed, or maintained properly.

INSTALLATION

1.Requirements

The fire suppression system must be supplied with a minimum water pipe size of 1/2” and be provided with 40 psi +/- 20 psi (2.75 bar +/- 1.37 bar) of pressure. For use of optional manual bypass, a second source with the same piping and pressure requirements is required.

28

American Dryer Corp.

113202 - 10

Image 32
Contents AD-115ES Installation Manual Retain This Manual In a Safe Place For Future Reference For Your Safety Page Table of Contents Safety Precautions SectionStandard SPECIFICATIONS/COMPONENT Identification SpecificationsSpecifications Gas, Electric, and Steam Component Identification 113202 Installation Procedures Location RequirementsUnpacking and Setting UP American Dryer Corp 113202 This Exhaust Duct Transition Piece Must be Installed First Dryer Enclosure Requirements Fresh AIR Supply RequirementsExhaust Requirements General Exhaust Ductwork InformationAmerican Dryer Corp 113202 Outside Ductwork Protection American Dryer Corp 113202 Electrical Information Reversing, 3ø Motor Gas and Steam Reversing, 3ø Motor Electric American Dryer Corp 113202 GAS Information Type of GAS Type of GAS American Dryer Corp 113202 Operating Steam Pressure Steam InformationSteam Damper System Compressed Air Supply Air Pressure113202 Water Information Before YOU Start Check Local Codes and Permits113202 Typical Water Supply Preparation for Operation and START-UP Preoperational Test Basket Tumbler Coating Dual Timer Dryers Preoperational InstructionsReversing Timer SPIN/DWELL Adjustments Shutdown InstructionsParts SERVICE/PARTS InformationService Warranty Information Returning Warranty CardsWarranty Returning Warranty PartsAmerican Dryer Corp 113202 Suggested Cleaning Schedule Routine MaintenanceCleaning Adjustments LubricationData Label Information Procedure for Functional Check Replacement Components 113202 Dual Timer Manual Reset Burner HI-LIMIT InstructionsPhase 113202 ADC Part No 10 12/10/08