ADC AD-115ES installation manual American Dryer Corp 113202

Page 28

A 1/8” N.P.T. plugged tap, accessible for a test gauge connection, must be installed in the main gas supply line immediately upstream of each dryer.

IMPORTANT: Pipe joint compounds that resist the action of natural and liquid propane (L.P.) gases must be used.

IMPORTANT: Test ALL connections for leaks by brushing on a soapy water solution (liquid detergent works well).

WARNING: NEVER TEST FOR GAS LEAKS WITH A FLAME!!!

IMPORTANT: The dryer and its individual shutoff valve must be disconnected from the gas supply piping system during any pressure testing of that system at test pressures in excess of 1/2 psig (3.5 kPa).

NOTE: The dryer must be isolated from the gas supply piping system by closing its individual manual shutoff valve during any pressure testing of the gas supply piping system at test pressures equal to or less than 1/2 psig (3.5 kPa).

24

American Dryer Corp.

113202 - 10

Image 28
Contents AD-115ES Installation Manual Retain This Manual In a Safe Place For Future Reference For Your Safety Page Table of Contents Safety Precautions SectionStandard SPECIFICATIONS/COMPONENT Identification SpecificationsSpecifications Gas, Electric, and Steam Component Identification 113202 Installation Procedures Location RequirementsUnpacking and Setting UP American Dryer Corp 113202 This Exhaust Duct Transition Piece Must be Installed First Dryer Enclosure Requirements Fresh AIR Supply RequirementsExhaust Requirements General Exhaust Ductwork InformationAmerican Dryer Corp 113202 Outside Ductwork Protection American Dryer Corp 113202 Electrical Information Reversing, 3ø Motor Gas and Steam Reversing, 3ø Motor Electric American Dryer Corp 113202 GAS Information Type of GAS Type of GAS American Dryer Corp 113202 Operating Steam Pressure Steam InformationSteam Damper System Compressed Air Supply Air Pressure113202 Water Information Before YOU Start Check Local Codes and Permits113202 Typical Water Supply Preparation for Operation and START-UP Preoperational Test Basket Tumbler Coating Dual Timer Dryers Preoperational InstructionsReversing Timer SPIN/DWELL Adjustments Shutdown InstructionsService SERVICE/PARTS InformationParts Warranty Information Returning Warranty CardsWarranty Returning Warranty PartsAmerican Dryer Corp 113202 Cleaning Routine MaintenanceSuggested Cleaning Schedule Adjustments LubricationData Label Information Procedure for Functional Check Replacement Components 113202 Phase Manual Reset Burner HI-LIMIT InstructionsDual Timer 113202 ADC Part No 10 12/10/08