American Dryer ML-200 manual Installation Procedures, Reassembly of Dryer

Page 13

SECTION III

INSTALLATION PROCEDURES

Installation in a proper location should be performed by competent technicians in accordance with local and state codes. In the absence of these codes, the installation must conform to applicable American National Standards: ANSI Z223.1-LATEST EDITION (National Fuel Gas Code) or ANSI/NFPA NO. 70-LATEST EDITION (National Electrical Code) or in Canada, the installation must conform to applicable Canadian Standards: CAN/CGA-B149.1-M91 (Natural Gas) or CAN/CGA-B149.2-M91 (L.P. Gas) or LATEST EDITION (for General Installation and Gas Plumbing) or Canadian Electrical Codes Parts 1 & 2 CSA C22.1-1990 or LATEST EDITION (for Electrical Connections).

A. REASSEMBLY OF DRYER

IMPORTANT: Always keep the tumbler (basket) section of the dryer in an upright position when movingit.

The ML-200 (gas model dryer) may be shipped one of two ways; as a complete unit fully as- sembled and ready for hookup or in two (2) pieces with the middle frame separated from the base. At installation, the middle frame will be lifted onto the base. Use cables through the eye bolts on top of the middle frame for lifting. Fasten the middle frame to the base by using the four (4) #3/8-16 bolts provided with the unit. Also, reconnect the V-belts, belt guard at the rear end of the unit, and reconnect the electrical plugs located in the front control boxes.

The ML-200 (steam models) can also be shipped with the middle frame separated from the base. In this case, follow the instructions for reassembly of the gas dryer. The steam dryer may also be shipped with the steam coil and damper piston removed. If this is the case, lift the steam coil on top of the middle frame, with the steam connection pipes facing the right side of the unit, and bolt the coil to the top of the middle frame using the #3/8-16 bolts pro- vided. Also, bolt the damper piston and sole- noid valve to the top of the middle frame using the bolts provided. There are three (3) panels that cover the front, right side, and rear of the steam coil. Fasten these in position.

9

Image 13
Contents ML-200 Non-Tilting Retain This Manual In a Safe Place For Future Reference Foryour Safety Page Table of Contents Section Procedure for Functional Check of Replacement Important Information SectionWhat to do if YOU Smell GAS Safety PrecautionsPage Component Identification Specifications GAS and Steam ModelsML-200 Dimensions and Component Location Page Reassembly of Dryer Installation ProceduresPage Page Location Requirements Fresh AIR Supply Exhaust Requirements Page Compressed AIR Supply System Electrical Requirements Electrical InformationMLG-200 Gas Hp Blower/3 Hp Drive Motor MLS-200 Steam Hp Blower/3 Hp Drive Motor Page GAS Information Type of GAS Latest Edition Page System Connections Section H, item Steam InformationPage Compressed Air Supply Air Pressure Diagram Preparation for OPERATION/START-UP Preoperational Tests Basket Coating Shut Down Instructions Service SERVICE/PARTS InformationParts Returning Warranty Cards Warranty InformationWarranty Returning Warranty PartsPage Cleaning Routine MaintenanceSteam Dryers only Lubrication AdjustmentsTumbler Basket Drive System Component System DescriptionsTUMBLER/BASKET AIR Blower Drive SystemLoad Door Switches Safety DevicesSteam Damper Actuator System No Display TroubleshootingFailed reversing contactor relay Failed microprocessor controller computer Page Blown 24 VAC control circuit fuse fuse Page For GAS Models only Excessive noise and/or vibration Tumbler basket out of alignment Procedure for Functional Check Replacement Components Page Page P O R T a N T Manual Reset HI-LIMIT InstructionsADC113142 1- 04/21/00-8