American Dryer Corp ML-122D installation manual Dryer Enclosure Requirements

Page 17

C. DRYER ENCLOSURE REQUIREMENTS

Even though a 30-inch (76.2 cm) clearance is acceptable, it is recommended that the rear of the dryer be positioned approximately 3 feet (0.91 meters) from nearest obstruction (i.e. wall) for ease of installation, maintenance, and service. Bulkheads and partitions should be made from noncombustible materials. The clearance between the bulkhead header and the dryer must be a minimum of 4-inches (10.2 cm) and must not extend more than 4-inches (10.2 cm) to the rear of the dryer front. The bulkhead facing must not be closed in ALL the way to the top of the dryer. A 2-inch (5.08 cm) clearance is required.

NOTE: Bulkhead facing should not be installed until after dryer is in place. Ceiling area must be located a minimum of 12-inches (31 cm) above the top of the dryer.

NOTE: When fire sprinkler systems are located above the dryers, a minimum of 18-inches (46 cm) above the dryer console (module) is suggested. Dryers may be positioned sidewall to sidewall however, 1 or 2-inches (2.54 or 5.08 cm) is suggested between dryers (or wall) for ease of installation and maintenance. Allowances must be made for the opening and closing of the control and lint doors.

13

Image 17
Contents ML-122D Retain This Manual In a Safe Place For Future Reference For Your Safety Page Table of Contents Section Procedure for Functional Check of Replacement Receiving and Handling Important InformationWhat to do if YOU Smell GAS Safety PrecautionsStandards Specifications GAS and Steam SPECIFICATIONS/COMPONENT IdentificationSpecifications MLG-122 Gas MLS-122 Steam Component Identification Page Location Requirements Installation ProceduresUNPACKING/SETTING UP Lift the console module off the dryer base C Dryer Enclosure Requirements Fresh AIR Supply Requirements Exhaust Requirements Page Page Page Page Electrical Requirements Electrical InformationML-122 Gas and Steam Only Page GAS Information Type of GAS Page Page Steam Information Operating Steam PressurePage Compressed AIR Pressure AIR Supply Page Preparation for OPERATION/START-UP Compressed AIRPreoperational Tests Inches 26.1 mb water column Basket Coating Operating Instructions Shut Down Instructions Parts SERVICE/PARTS InformationService Returning Warranty Cards Warranty InformationWarranty Returning Warranty PartsPage Cleaning Routine MaintenanceSteam Dryers Lubrication AdjustmentsTiming Legend Reversing Timer SPIN/DWELL AdjustmentsProcedure for Functional Check Replacement Components Page Page Page Data Label Data Label InformationSerial Number For Phase 6 Models ADC 02/16/00-15 11/10/00-10 08/13/01-25