American Dryer Corp ML-122D installation manual Compressed AIR, Preparation for OPERATION/START-UP

Page 35

I. COMPRESSED AIR

The ML-122 is manufactured with a pneumatic Air Jet damper system, which requires an external supply of compressed air. The air connection is made at the rear of the top console.

1. Air Requirements

COMPRESSED

AIR PRESSURE

AIR SUPPLY

 

 

 

 

 

Normal

80 PSI

5.51 bars

 

 

 

Minimum Supply

70 PSI

4.82 bars

 

 

 

Maximum Supply

90 PSI

6.21 bars

 

 

 

Shaded areas are stated in metric equivalents

2.Air Connection

Air connection to system --- 1/8” F.P.T.

3.No air regulator or filtration is provided with the dryer. External regulation/filtration of 80 PSI (5.51 bars) must be provided. It is suggested that a regulator/filter gauge arrangement be added to the compressed air line just before the dryer connection. This is necessary to insure that correct and clean air pressure is achieved.

J.PREPARATION FOR OPERATION/START-UP

The following items should be checked before attempting to operate the dryer:

1.Read ALLCAUTION,” “WARNING,” and “DIRECTION” labels attached to the dryer.

2.Check incoming supply voltage to be sure that it is the same as indicated on the dryer data label that is affixed to the left side panel area behind the top control (access) door (refer to the illustration on page 9). In the case of 208 VAC or 240 VAC, THE SUPPLY VOLTAGE MUST MATCH THE ELECTRIC SERVICE EXACTLY.

3.GAS MODELS - check to assure that the dryer is connected to the type of heat/gas indicated on the dryer data label.

4.GAS MODELS - the sail switch damper assembly was installed and pre-adjusted at the factory prior to shipping. However, each sail switch adjustment must be checked to assure that this important safety control is functioning.

5.GAS MODELS - be sure that ALL gas shutoff valves are in the open position.

6.Be sure that ALL electric box covers have been replaced.

7.Check ALL service doors to assure that they are closed and secured in place.

31

Image 35
Contents ML-122D Retain This Manual In a Safe Place For Future Reference For Your Safety Page Table of Contents Section Procedure for Functional Check of Replacement Receiving and Handling Important InformationWhat to do if YOU Smell GAS Safety PrecautionsStandards Specifications GAS and Steam SPECIFICATIONS/COMPONENT IdentificationSpecifications MLG-122 Gas MLS-122 Steam Component Identification Page Location Requirements Installation ProceduresUNPACKING/SETTING UP Lift the console module off the dryer base C Dryer Enclosure Requirements Fresh AIR Supply Requirements Exhaust Requirements Page Page Page Page Electrical Requirements Electrical InformationML-122 Gas and Steam Only Page GAS Information Type of GAS Page Page Steam Information Operating Steam PressurePage Compressed AIR Pressure AIR Supply Page Preparation for OPERATION/START-UP Compressed AIRPreoperational Tests Inches 26.1 mb water column Basket Coating Operating Instructions Shut Down Instructions Parts SERVICE/PARTS InformationService Returning Warranty Parts Warranty InformationReturning Warranty Cards WarrantyPage Cleaning Routine MaintenanceSteam Dryers Lubrication AdjustmentsTiming Legend Reversing Timer SPIN/DWELL AdjustmentsProcedure for Functional Check Replacement Components Page Page Page Data Label Data Label InformationSerial Number For Phase 6 Models ADC 02/16/00-15 11/10/00-10 08/13/01-25