American Dryer Corp ML-122D installation manual Operating Steam Pressure, Steam Information

Page 31

H. STEAM INFORMATION

It is your responsibility to have ALL plumbing connections made by a qualified professional to assure that the gas plumbing installation is adequate and conforms to local and state regulations or codes.

IMPORTANT: Failure to comply with the requirements stipulated in this manual can result in component failure, which will VOID THE WARRANTY.

NOTE: The MLS-122 is manufactured with a pneumatic (piston) damper system, which requires an external supply of clean, dry, regulated air 80 PSI +/- 10 PSI (5.51 bars +/- 0.69 bars). Refer to Steam Damper Air System Connections , item 4 (page 29).

1.Steam Coil PH Level

The normal PH level for copper type steam coils must be maintained between a value of 8.5 to 9.5. For steel type steam coils the PH level must be maintained between a value of 9.5 to 10.5. These limits are set to limit the acid attack of the steam coils.

IMPORTANT: Coil failure due to improper PH level will VOID THE WARRANTY.

2.Steam Requirements - High Pressure

Inlet -------- 1-1/4” supply line connection -- qty. one (1) at top manifold. Return ----- 1-1/4” return line connection --- qty. one (1) at bottom manifold.

OPERATING STEAM PRESSURE

MAXIMUM

125 psig

862 kPa

MINIMUM

100 psig*

689 kPa

 

 

 

HEAT INPUT (NORMAL LOAD)

13 Bhp

 

 

 

CONSUMPTION (APPROXIMATE)

450 lbs/hr

204 kg/hr

Shaded areas are stated in metric equivalents

 

 

*Minimum operating pressure for optimum results.

3.Installation Instructions

To insure an adequate supply of steam is provided, be sure that the steam lines and steam return lines are sized and laid out as stipulated in this manual. Inadequate steam lines and steam return lines or improper steam plumbing will result in poor performance and can cause component failure. Clean, dry steam must be provided to the dryer.

IMPORTANT: Steam coil failure due to water hammer by wet steam will VOID THE WARRANTY.

27

Image 31
Contents ML-122D Retain This Manual In a Safe Place For Future Reference For Your Safety Page Table of Contents Section Procedure for Functional Check of Replacement Receiving and Handling Important InformationWhat to do if YOU Smell GAS Safety PrecautionsStandards Specifications GAS and Steam SPECIFICATIONS/COMPONENT IdentificationSpecifications MLG-122 Gas MLS-122 Steam Component Identification Page Location Requirements Installation ProceduresUNPACKING/SETTING UP Lift the console module off the dryer base C Dryer Enclosure Requirements Fresh AIR Supply Requirements Exhaust Requirements Page Page Page Page Electrical Requirements Electrical InformationML-122 Gas and Steam Only Page GAS Information Type of GAS Page Page Steam Information Operating Steam PressurePage Compressed AIR Pressure AIR Supply Page Preparation for OPERATION/START-UP Compressed AIRPreoperational Tests Inches 26.1 mb water column Basket Coating Operating Instructions Shut Down Instructions Service SERVICE/PARTS InformationParts Returning Warranty Parts Warranty InformationReturning Warranty Cards WarrantyPage Cleaning Routine MaintenanceSteam Dryers Lubrication AdjustmentsTiming Legend Reversing Timer SPIN/DWELL AdjustmentsProcedure for Functional Check Replacement Components Page Page Page Data Label Data Label InformationSerial Number For Phase 6 Models ADC 02/16/00-15 11/10/00-10 08/13/01-25