American Dryer Corp ML-122D installation manual

Page 21

IMPORTANT: Exhaust back pressure measured by a manometer at each basket (tumbler) exhaust duct area must be no less than 0 and must not exceed 0.3 inches (0.74 mb) of water column (W.C.).

a.Ducting (Horizontal and Vertical)

1)For single dryer horizontal ducting the minimum duct size is 16-inches (40.64 cm) in diameter, the duct run should not have more than one (1) elbow (including outside protection), and must not exceed 40 feet (12.2 meters) in total length. With single dryer vertical ducting, the minimum duct size is 18-inches (45.72 cm) in diameter, the duct run should not have more than three (3) elbows (including outside protection), and must not exceed 20 feet (6.1 meters) in total length.

IMPORTANT: When the ductwork approaches the maximum limits as noted in this manual, a professional heating, venting, and air conditioning (HVAC) firm should be consulted for proper venting information.

ALL ductwork should be smooth inside with no projections from sheet metal screws or other obstructions, which will collect lint. When adding ducts, the duct to be added should overlap the duct to which it is to be connected. ALL ductwork joints must be taped to prevent moisture and lint from escaping into the building. Inspection doors should be installed at strategic points in the exhaust ductwork for periodic inspection and cleaning of lint from the ductwork.

NOTE: When the exhaust ductwork passes through a wall, ceiling, or roof made of combustible materials, the opening must be 2-inches (5.08 cm) larger than the duct (all the way around). The duct must be centered within this opening.

17

Image 21
Contents ML-122D Retain This Manual In a Safe Place For Future Reference For Your Safety Page Table of Contents Section Procedure for Functional Check of Replacement Receiving and Handling Important InformationWhat to do if YOU Smell GAS Safety PrecautionsStandards Specifications GAS and Steam SPECIFICATIONS/COMPONENT IdentificationSpecifications MLG-122 Gas MLS-122 Steam Component Identification Page Location Requirements Installation ProceduresUNPACKING/SETTING UP Lift the console module off the dryer base C Dryer Enclosure Requirements Fresh AIR Supply Requirements Exhaust Requirements Page Page Page Page Electrical Requirements Electrical InformationML-122 Gas and Steam Only Page GAS Information Type of GAS Page Page Steam Information Operating Steam PressurePage Compressed AIR Pressure AIR Supply Page Preparation for OPERATION/START-UP Compressed AIRPreoperational Tests Inches 26.1 mb water column Basket Coating Operating Instructions Shut Down Instructions SERVICE/PARTS Information ServiceParts Returning Warranty Cards Warranty InformationWarranty Returning Warranty PartsPage Cleaning Routine MaintenanceSteam Dryers Lubrication AdjustmentsTiming Legend Reversing Timer SPIN/DWELL AdjustmentsProcedure for Functional Check Replacement Components Page Page Page Data Label Data Label InformationSerial Number For Phase 6 Models ADC 02/16/00-15 11/10/00-10 08/13/01-25