American Dryer Corp ML-122D installation manual Adjustments, Lubrication

Page 46

B. ADJUSTMENTS

7 DAYS AFTER INSTALLATION AND EVERY 6 MONTHS THEREAFTER

Inspect bolts, nuts, screws, (bearing setscrews), grounding connections, and nonpermanent gas connections (i.e., unions, shutoff valves, and orifices). Motor and drive belts should be examined. Cracked or seriously frayed belts should be replaced. Tighten loose V-belts when necessary. Complete operational check of controls and valves. Complete operational check of ALL safety devices (i.e., door switch, lint drawer switch, sail switch, burner and hi-limit thermostat).

C. LUBRICATION

The drive shaft bearings and idler shaft bearings should be lubricated every 3 months. Use a #2 grease or its equivalent. Lubrication is necessary.

For models manufactured prior to March 31, 2000, the motor bearings...and under normal/most conditions the basket (tumbler) bearing are permanently lubricated. It is physically possible to relubricate the basket (tumbler) bearing if you choose to do so even though this practice may not be necessary. Use Industrial Chevron ball or roller bearing SRI grease NLGI2 or its equivalent which has a broad operating temperature range of -22° F (-30° C) to 350° F (177° C).

42

Image 46
Contents ML-122D Retain This Manual In a Safe Place For Future Reference For Your Safety Page Table of Contents Section Procedure for Functional Check of Replacement Important Information Receiving and HandlingSafety Precautions What to do if YOU Smell GASStandards SPECIFICATIONS/COMPONENT Identification Specifications GAS and SteamSpecifications MLG-122 Gas MLS-122 Steam Component Identification Page Installation Procedures Location RequirementsUNPACKING/SETTING UP Lift the console module off the dryer base C Dryer Enclosure Requirements Fresh AIR Supply Requirements Exhaust Requirements Page Page Page Page Electrical Information Electrical RequirementsML-122 Gas and Steam Only Page GAS Information Type of GAS Page Page Operating Steam Pressure Steam InformationPage Compressed AIR Pressure AIR Supply Page Compressed AIR Preparation for OPERATION/START-UPPreoperational Tests Inches 26.1 mb water column Basket Coating Operating Instructions Shut Down Instructions Service SERVICE/PARTS InformationParts Warranty Warranty InformationReturning Warranty Cards Returning Warranty PartsPage Routine Maintenance CleaningSteam Dryers Adjustments LubricationReversing Timer SPIN/DWELL Adjustments Timing LegendProcedure for Functional Check Replacement Components Page Page Page Data Label Information Data LabelSerial Number For Phase 6 Models ADC 02/16/00-15 11/10/00-10 08/13/01-25