American Dryer Corp ML-122D installation manual

Page 50

e.Open main door. The dryer must stop and ALL indicator dots of the microprocessor controller (computer) light emitting diode (L.E.D.) display must go out. (Refer to the illustration on the previous page.)

f.Try to restart the dryer with the main door open.

g.The microprocessor controller (computer) board’s L.E.D. display must read “MAIN dOOR.”

h.Close the main door and restart the dryer.

i.Functional check of microprocessor controller (computer) board is complete.

2.For Models With Johnson Controls Direct Spark Ignition (DSI) Module (G760) Theory Of Operation:

Start the drying cycle. When the gas burner ignites within the chosen trial for ignition time (6-seconds), the flame sensor detects gas burner flame and signals the DSI module to keep the gas valve open...as long as there is a call for heat. The DSI module will “LOCKOUT” if the gas burner flame is not sensed at the end of the trial for ignition period. The trial for ignition period will be repeated for a total of three (3) retries/trials (the initial try and two [2] more retries/trials). If the flame is not sensed at the end of the third retry/trial (inter-purge period of 30-seconds) the DSI module will “LOCKOUT” (light emitting diode [L.E.D.] flashes).

A steady L.E.D. indicator indicates normal operation.

No L.E.D. indicator indicates a power or an internal failure has occurred.

46

Image 50
Contents ML-122D Retain This Manual In a Safe Place For Future Reference For Your Safety Page Table of Contents Section Procedure for Functional Check of Replacement Important Information Receiving and HandlingSafety Precautions What to do if YOU Smell GASStandards SPECIFICATIONS/COMPONENT Identification Specifications GAS and SteamSpecifications MLG-122 Gas MLS-122 Steam Component Identification Page Installation Procedures Location RequirementsUNPACKING/SETTING UP Lift the console module off the dryer base C Dryer Enclosure Requirements Fresh AIR Supply Requirements Exhaust Requirements Page Page Page Page Electrical Information Electrical RequirementsML-122 Gas and Steam Only Page GAS Information Type of GAS Page Page Operating Steam Pressure Steam InformationPage Compressed AIR Pressure AIR Supply Page Compressed AIR Preparation for OPERATION/START-UPPreoperational Tests Inches 26.1 mb water column Basket Coating Operating Instructions Shut Down Instructions Parts SERVICE/PARTS InformationService Warranty Warranty InformationReturning Warranty Cards Returning Warranty PartsPage Routine Maintenance CleaningSteam Dryers Adjustments LubricationReversing Timer SPIN/DWELL Adjustments Timing LegendProcedure for Functional Check Replacement Components Page Page Page Data Label Information Data LabelSerial Number For Phase 6 Models ADC 02/16/00-15 11/10/00-10 08/13/01-25