American Dryer Corp ML-122D installation manual

Page 51

3.For Direct Spark Ignition (DSI) System Models Manufactured With ADC Module Part No. 882627

a. Upon completing installation of the replacement DSI module, reestablish power to the dryer.

b. Starting the drying cycle.

c. The ignition DSI module’s light emitting diode (L.E.D.) indicator will light “red” for up to approximately 1.5-seconds (prepurge time).

d. The module’s indicator light will then turn “green.” The gas valve will be energized and the ignitor probe will spark for approximately 8-seconds. The burner flame should now be established.

e. With the burner flame on, remove the flame sensor wire from the FS terminal of the DSI module.

f. The burner flame must shut off and the ignition module must lockout with the DSI module’s indicator light “red.”

g.Stop the drying cycle, with the flame sensor wire still removed, restart the drying cycle.

h.The ignition module must proceed through the prepurge, with the indicator light “red,” the ignition trial time of approximately 8-seconds, with the indicator light “green,” and then proceed to lockout with the indicator light “red.”

i.Functional check of the DSI module is complete.

1)Replace the flame sensor wire from the FS terminal to the DSI module.

47

Image 51
Contents ML-122D Retain This Manual In a Safe Place For Future Reference For Your Safety Page Table of Contents Section Procedure for Functional Check of Replacement Receiving and Handling Important InformationWhat to do if YOU Smell GAS Safety PrecautionsStandards Specifications GAS and Steam SPECIFICATIONS/COMPONENT IdentificationSpecifications MLG-122 Gas MLS-122 Steam Component Identification Page Location Requirements Installation ProceduresUNPACKING/SETTING UP Lift the console module off the dryer base C Dryer Enclosure Requirements Fresh AIR Supply Requirements Exhaust Requirements Page Page Page Page Electrical Requirements Electrical InformationML-122 Gas and Steam Only Page GAS Information Type of GAS Page Page Steam Information Operating Steam PressurePage Compressed AIR Pressure AIR Supply Page Preparation for OPERATION/START-UP Compressed AIRPreoperational Tests Inches 26.1 mb water column Basket Coating Operating Instructions Shut Down Instructions SERVICE/PARTS Information ServiceParts Returning Warranty Parts Warranty InformationReturning Warranty Cards WarrantyPage Cleaning Routine MaintenanceSteam Dryers Lubrication AdjustmentsTiming Legend Reversing Timer SPIN/DWELL AdjustmentsProcedure for Functional Check Replacement Components Page Page Page Data Label Data Label InformationSerial Number For Phase 6 Models ADC 02/16/00-15 11/10/00-10 08/13/01-25