NOTE: During the purging period, check to be sure that ALL gas shutoff valves are open.
3)Once ignition is established, a gas pressure test should be taken at the gas valve pressure tap of each dryer to assure that the water column (W.C.) pressure is correct and consistent.
NOTE: Water column pressure requirements (measured at the gas valve pressure tap)...
Natural Gas | 3.5 inches (8.7 mb) water column. |
Liquid Propane (L.P.) Gas | 10.5 inches (26.1 mb) water column. |
IMPORTANT: There is no regulator provided in an L.P. dryer. The water column pressure must be regulated at the source (L.P. tank) or an external regulator must be added to each dryer.
b.Steam Models
1)Check to insure that the steam damper is functioning properly.
a)The steam damper should not “slam” (open or closed) when it reaches the end of (piston) travel. Additionally, the steam damper should not bind and/or stop during travel. If either of these conditions occur, the flow control must be adjusted. Refer to the bottom illustration on page 30 for air adjustment instructions.
6.Make a complete operational check of ALL
NOTE: To check for proper sail switch operation, open the main door and while holding main door switch plunger in, start the dryer. The dryer should start but the heat circuit should not be activated (on). If the heat (burner) does activate, shut the dryer off and make the necessary adjustments.
7.A reversing basket (tumbler) dryer should never be operated with less than a 60 lb (27 kg) load (dry weight). The size of the load will affect the
a.Microprocessor Controller (Computer) Dryer Models
1)Spin and stop are not adjustable in the Automatic Mode and have been preprogrammed into the microprocessor controller (computer) for
2)Spin and stop times are adjustable in the Manual (timed) Mode.
b.Dual Timer Dryer Models
1)Both spin time and dwell (stop) time are adjustable (refer to page 43).
33