American Dryer Corp ML-122D installation manual Routine Maintenance, Cleaning

Page 44

SECTION VI

ROUTINE MAINTENANCE

A. CLEANING

A program and/or schedule should be established for periodic inspection, cleaning, and removal of lint from various areas of the dryer, as well as throughout the ductwork system. The frequency of cleaning can best be determined from experience at each location. Maximum operating efficiency is dependent upon proper air circulation. The accumulation of lint can restrict this airflow. If the guidelines in this section are met, an ADC dryer will provide many years of efficient, trouble-free, and most importantly safe operation.

WARNING: LINT FROM MOST FABRICS IS HIGHLY COMBUSTIBLE. THE ACCUMULATION OF LINT CAN CREATE A POTENTIAL FIRE HAZARD.

WARNING: KEEP DRYER AREA CLEAR AND FREE FROM COMBUSTIBLE MATERIALS, GASOLINE, AND OTHER FLAMMABLE VAPORS AND LIQUIDS.

NOTE: REMOVE POWER FROM THE DRYER BEFORE PERFORMING ANY MAINTENANCE IN THE DRYER (cleaning the lint drawer is the only exception).

NOTE: Suggested time intervals shown are for average usage which is considered six (6) to eight (8) operational (running) hours per day.

IMPORTANT: Dryer produces combustible lint and must be exhausted to the outdoors. Every 6

months, inspect the exhaust ducting and remove any lint build up.

CLEAN LINT FROM LINT DRAWER/SCREEN EVERY THIRD OR FOURTH LOAD.

NOTE: The frequency of cleaning the lint screens can best be determined from experience at each location.

WEEKLY

Clean lint accumulation from the lint chamber, thermostat, and microprocessor temperature sensor (sensor bracket) area.

WARNING: TO AVOID HAZARD OF ELECTRICAL SHOCK, DISCONTINUE

ELECTRICAL POWER SUPPLY TO THE DRYER.

40

Image 44
Contents ML-122D Retain This Manual In a Safe Place For Future Reference For Your Safety Page Table of Contents Section Procedure for Functional Check of Replacement Important Information Receiving and HandlingSafety Precautions What to do if YOU Smell GASStandards SPECIFICATIONS/COMPONENT Identification Specifications GAS and SteamSpecifications MLG-122 Gas MLS-122 Steam Component Identification Page Installation Procedures Location RequirementsUNPACKING/SETTING UP Lift the console module off the dryer base C Dryer Enclosure Requirements Fresh AIR Supply Requirements Exhaust Requirements Page Page Page Page Electrical Information Electrical RequirementsML-122 Gas and Steam Only Page GAS Information Type of GAS Page Page Operating Steam Pressure Steam InformationPage Compressed AIR Pressure AIR Supply Page Compressed AIR Preparation for OPERATION/START-UPPreoperational Tests Inches 26.1 mb water column Basket Coating Operating Instructions Shut Down Instructions Parts SERVICE/PARTS InformationService Warranty Information Returning Warranty CardsWarranty Returning Warranty PartsPage Routine Maintenance CleaningSteam Dryers Adjustments LubricationReversing Timer SPIN/DWELL Adjustments Timing LegendProcedure for Functional Check Replacement Components Page Page Page Data Label Information Data LabelSerial Number For Phase 6 Models ADC 02/16/00-15 11/10/00-10 08/13/01-25