American Dryer Corp ML-122D installation manual

Page 34

6.Steam Damper Air Piston (Flow Control) Operation Adjustment

Although the steam damper operation was tested and adjusted prior to shipping at 80 PSI (5.51 bars), steam damper operation must be checked before the dryer is put into operation. Refer to page 33 for instructions to check steam damper operation. If steam damper adjustment is necessary, locate the flow control valve and make the necessary adjustments as noted below.

30

Image 34
Contents ML-122D Retain This Manual In a Safe Place For Future Reference For Your Safety Page Table of Contents Section Procedure for Functional Check of Replacement Important Information Receiving and HandlingSafety Precautions What to do if YOU Smell GASStandards SPECIFICATIONS/COMPONENT Identification Specifications GAS and SteamSpecifications MLG-122 Gas MLS-122 Steam Component Identification Page Installation Procedures Location RequirementsUNPACKING/SETTING UP Lift the console module off the dryer base C Dryer Enclosure Requirements Fresh AIR Supply Requirements Exhaust Requirements Page Page Page Page Electrical Information Electrical RequirementsML-122 Gas and Steam Only Page GAS Information Type of GAS Page Page Operating Steam Pressure Steam InformationPage Compressed AIR Pressure AIR Supply Page Compressed AIR Preparation for OPERATION/START-UPPreoperational Tests Inches 26.1 mb water column Basket Coating Operating Instructions Shut Down Instructions Service SERVICE/PARTS InformationParts Warranty Warranty InformationReturning Warranty Cards Returning Warranty PartsPage Routine Maintenance CleaningSteam Dryers Adjustments LubricationReversing Timer SPIN/DWELL Adjustments Timing LegendProcedure for Functional Check Replacement Components Page Page Page Data Label Information Data LabelSerial Number For Phase 6 Models ADC 02/16/00-15 11/10/00-10 08/13/01-25