CAUTION: This dryer produces combustible lint and must be exhausted to the outdoors. Every 6 months, inspect the exhaust ducting and remove any lint build up.

IMPORTANT: Dryer must be installed in a location/environment, which the ambient temperature remains between 40º F (4.44º C) and 130º F (54.44º C).

B. UNPACKING AND SETTING UP

Remove protective shipping material (i.e., plastic wrap and optional shipping box) from dryer.

IMPORTANT: Dryer must be transported and handled in an upright position at ALL times.

The dryer can be moved to its final location while still attached to the skid or with the skid removed. To unskid the dryer, locate and remove the four (4) lag bolts securing the base of the dryer to the wooden skid. Two (2) are located at the rear base (remove the back panel for access), and two (2) are located in the bottom of the lint chamber. To remove the two (2) lag bolts located in the lint chamber area, remove the lint drawer and the two (2) Phillips head screws securing the lint door in place.

NOTE: Lint door cannot be removed totally from dryer due to a safety chain. The chain is secured to the dryer and door with special tamperproof screws. The safety chain must not be removed or cut from the lint door. Once these lag bolts are off, remove the eight (8) nuts and bolts holding the skid together and take the skid apart. The dryer can now be removed from the skid and set into place.

1.Leveling Dryer

a.To level dryer, place 4-inch (10.16 cm) square metal shims (refer to the illustration above) or other suitable material under the base pads. It is suggested that the dryer be tilted slightly to the rear.

11

Image 15
Contents AD-115ES Retain This Manual In a Safe Place For Future Reference For Your Safety Page Table of Contents Cleaning Adjustments Lubrication Data LabelGas Models Only Electric or Steam Models Only Receiving and Handling Important InformationWhat to do if YOU Smell GAS Safety PrecautionsStandard Specifications SPECIFICATIONS/COMPONENT IdentificationPage Component Identification Page Location Requirements Installation ProceduresUnpacking and Setting UP Page This Exhaust Duct Transition Piece Must be Installed First Dryer Enclosure Requirements Fresh AIR Supply Requirements General Exhaust Ductwork Information Exhaust RequirementsPage Page Page Page Page Page Page Electrical Information Electrical Service Specifications PER Dryer ADE-115ES 60 Kw Electric Oven Reversing, 3ø Motor ADE-115ES 72 Kw Electric Oven Reversing, 3ø Motor Page Page GAS Information 27.4 mb 26.1 mbPage Page Steam Information 689 kPa170.1 kg/hr Page Compressed AIR AIR Pressure Supply Page Preparation for Operation and START-UP Preoperational Tests Page Basket Tumbler Coating Shutdown InstructionsSERVICE/PARTS Information ServiceParts Returning Warranty Parts Warranty InformationReturning Warranty Cards WarrantyPage Clean the lint drawer or screen every third or fourth load Routine MaintenanceCleaning Suggested Cleaning ScheduleSteam Dryers Lubrication AdjustmentsTroubleshooting No light emitting diode L.E.D. displayDrive motor is not operating does not start Blower motor is not operating does not start Microprocessor controller computer display reads door Microprocessor controller computer display reads dSFLFailed microprocessor controller computer No heat for Electric Models only No heat for Steam Models onlyCondensation on main door glass Dryer operates but is taking too long to dryExcessive noise or vibration Dryer is making scraping noise at basket tumbler areaData Label Data Label InformationSerial Number Timing Legend Reversing Timer SPIN/DWELLADJUSTMENTSProcedure for Functional Check Replacement Components Page Page P O R T a N T ADC P/N114501