American Dryer Corp AD-115ES II installation manual Adjustments, Lubrication

Page 51

B. ADJUSTMENTS

7 DAYS AFTER INSTALLATION AND EVERY 6 MONTHS THEREAFTER

Inspect bolts, nuts, screws (bearing setscrews), grounding connections, and nonpermanent gas connections (unions, shutoff valves, and orifices). Motor and drive belts should be examined. Cracked or seriously frayed belts should be replaced. Tighten loose V-belts when necessary. Complete operational check of controls and valves. Complete operational check of ALL safety devices (door switch, lint drawer switch, sail switch, burner, and hi-limit thermostats).

C. LUBRICATION

The motor bearings...and under normal/most conditions the basket (tumbler) and idler bearings are permanently lubricated. It is physically possible to relubricate the basket (tumbler) bearings if you choose to do so even though this practice may not be necessary. Use Shell Alvania #2 or its equivalent. The basket (tumbler) bearings used in the dryer DO NOT have a grease fitting. Provisions are made in the bearing housing for the addition of a grease fitting, which can be obtained elsewhere.

47

Image 51
Contents AD-115ES Retain This Manual In a Safe Place For Future Reference For Your Safety Page Table of Contents Cleaning Adjustments Lubrication Data LabelGas Models Only Electric or Steam Models Only Receiving and Handling Important InformationWhat to do if YOU Smell GAS Safety PrecautionsStandard Specifications SPECIFICATIONS/COMPONENT IdentificationPage Component Identification Page Location Requirements Installation ProceduresUnpacking and Setting UP Page This Exhaust Duct Transition Piece Must be Installed First Dryer Enclosure Requirements Fresh AIR Supply Requirements General Exhaust Ductwork Information Exhaust RequirementsPage Page Page Page Page Page Page Electrical Information Electrical Service Specifications PER Dryer ADE-115ES 60 Kw Electric Oven Reversing, 3ø Motor ADE-115ES 72 Kw Electric Oven Reversing, 3ø Motor Page Page GAS Information 27.4 mb 26.1 mbPage Page Steam Information 689 kPa170.1 kg/hr Page Compressed AIR AIR Pressure Supply Page Preparation for Operation and START-UP Preoperational Tests Page Basket Tumbler Coating Shutdown InstructionsSERVICE/PARTS Information ServiceParts Returning Warranty Parts Warranty InformationReturning Warranty Cards WarrantyPage Clean the lint drawer or screen every third or fourth load Routine MaintenanceCleaning Suggested Cleaning ScheduleSteam Dryers Lubrication AdjustmentsTroubleshooting No light emitting diode L.E.D. displayDrive motor is not operating does not start Blower motor is not operating does not start Microprocessor controller computer display reads door Microprocessor controller computer display reads dSFLFailed microprocessor controller computer No heat for Electric Models only No heat for Steam Models onlyCondensation on main door glass Dryer operates but is taking too long to dryExcessive noise or vibration Dryer is making scraping noise at basket tumbler areaData Label Data Label InformationSerial Number Timing Legend Reversing Timer SPIN/DWELLADJUSTMENTSProcedure for Functional Check Replacement Components Page Page P O R T a N T ADC P/N114501