Setup
Prefilling Lubricant Distributor Lines
Follow the following procedure exactly as written, in the order written.
NOTICE
•The initial startup and operation is the most critical operating period for a newly installed machine in terms of potential for being damaged by unre- moved/unfiltered lubricant contaminants and lack of adequate lubrication. Proper prefilling of lubrication system ensures that lubricant is immediately avail- able to every lube point during machine startup, protecting them from damage.
•Use only clean oil filtered to the SAE
Filling Secondary-to-Lube Point Lines
Refer to FIG. 4. when performing this procedure
.
3.In order to verify when lubricant is flowing and has reached the end of the lube line, loosen the connec- tor at the lube point of the line that is to be filled.
4.Stroke the hand pump until
5.Tighten the lube line connector at the lube point, but do not replace the port plugs or performance indica- tors into the ports on the front of the working sec- tion.
6.Repeat steps
NOTE: Do not replace any of the performance indica- tors or port plugs removed in Step 1 until the
Filling Master-to-Secondary Lube Lines
Refer to FIG. 5. when performing this procedure.
|
|
| LUBE POINT |
|
|
| SECONDARY BLEED |
LUBE POINT | MASTER | THROUGH | |
|
|
| ALL PORTS |
SECONDARY | BLEED HOSE |
|
|
HERE |
|
| |
| REMOVE INDICATOR |
| |
MASTER |
|
| |
| OR PORT PLUG |
| |
|
|
|
REMOVE INDICATOR
OR PORT PLUG
HAND PUMP | TI11098 |
FIG. 4
1.Remove port plugs or performance indicators from all of the indicator ports on front of secondary divider valves.
2.Connect a hand pump filled with clean, filtered lubri- cant to the indicator port closest to the first line to be filled that corresponds to the output port that is feed- ing the line to be filled.
HAND PUMP | TI11099 |
FIG. 5
1.Remove the port plugs or performance indicators from all the indicator ports on the front of the master divider valve.
2.Connect a hand pump filled with clean, filtered lubri- cant to the indicator port closest to the lube output port that is feeding the line to the secondary divider valve.
3.Stroke the hand pump to fill the line between the master divider valve and secondary divider valve.
312497P | 5 |