Operational Testing
Important
Tighten the
The chassis will be secured to its rack using four captive machine screws, located at either edge of the front panel. There may be optional mounting points at the rear of the
4.You may choose to clean the front panel of
Do not spray the front panel directly. The liquid may infiltrate the
In exceptionally dusty environments, it is permissible to vacuum the
Do not use pressurized air to clean the unit. Pressurized air will drive dirt into mechanical connections.
Operational Testing
1.
2.Observe the front panel indicators during the boot process:
Within four seconds of
Several boot messages will appear in the Frame Status display.
There will be two
3.Wait as long as one minute for the
The system has successfully booted with the Frame Status shows an animated
4.The
•System takes longer than one minute to display the
•The
•The Watchdog indicator displays blinking red during any part of the boot process.
•The Watchdog indicator displays solid red or blinking red while the Frame Status displays
24