Assembly
Step 1
Tools needed
Hammer
Check package contents
Cooking box (assembly)
7/16 and 3/4 inch
Pliers |
|
Block of wood | Lid |
(assembly) |
® ®
Phillips screwdriver
Supplies needed
You will need a soap and water solution to check for gas leaks. (See Step "Check for gas leaks.")
Note - The hardware size of nuts, bolts and screws is given. For example
While we give much attention to our products, unfortunately an occasional error may occur. If a part is missing, do not go back to the store. Call the W eber Customer Service Center toll free
Hose
Bottom tray
Cooking grates (2)
Flavorizer Bars (5)
Control panel
7