Braun NVL SERIES manual Fully-Vertical

Page 23

Operation Notes and Details

attendant must view the plat- form as it lowers to be certain the entire platform reaches and

Fully-Vertical

Outboard Barrier

3"

Note: Platform must raise approximately three inches before barrier raises fully.

rests safely on the ground. Stop pressing the DOWN switch if any portion of the platform is obstructed while descending or the entire platform does not reach ground level for any rea- son (contact with an obstruction, mechanical failure, exceeding WKHOLIW´ÁRRUWRJURXQGµFDSDFLW\ etc.).

Note: The barrier must be fully unfolded until the entire wheel- chair (or standee) has crossed when loading or unloading at ground level. Discontinue lift operation immediately if the outer barrier does not operate properly.

Bridging: The NVL incorpo- rates a bridging feature. This feature stops the down travel

of the platform if the outboard end of the platform contacts a raised surface (such as a curb), preventing the operator from lowering the inboard end of the platform.

Handrails: Dual handrails are provided for wheelchair pas- senger (or standee) use. The handrails unfold automatically to the deployed (horizontal) position when the lift unfolds and automatically fold to the stowed (vertical) position when the platform folds.

If able, passengers should grip both handrails when on the lift platform. Discontinue lift operation immediately if the handrails do not operate properly.

Page 21

Image 23
Contents Operators Manual for Congratulations Contents Series No Pump Code Model No Serial No Warranty and Registration InstructionsWarranty and Registration Instructions Illustration Lift TerminologyIntroduction Lift Components Vehicle and Lift Interlocks UP Platform Raise Up is the action of the platform raising Lift Actions and FunctionsDown Platform Lower Safety Symbols Safety FIRST! Know That Lift Operation SafetyLift Operation Safety Precautions RDGDQGXQORDGFOHDURIYHKLFXODUWUDIÀF Lift Operation Safety DXWKRULHG FHUWLÀHG VHUYLFHSHUVRQQHO Operation Notes and Details Press the switch labeled for the intended function Lift Features Disengaged Lift-Tite Latch Engagement Pin Roller When the Unfold switch is When the Fold switch is pressed Fully-Folded Fully-Unfolded Fully-Vertical GLIÀFXOW\XVLQJVWHSV Lift PassengersOperation Notes and Details Operation Notes and Details Wheelchair-Equipped Occupant Seat Belts Operation Procedure ReviewPreventive Maintenance Lift Operating Instructions Open Doors and Secure To Unfold Platform Lift Operating Instructions To Load Passenger To Fold Platform 9HULÀHG Nhtsa Operations ChecklistManual Operating Instructions Release Valve Down To Lower To Unfold Platform OutTo Fold Platform Up To RaiseTo Store Pump Handle To Install Pump Cover Lift is only as safe as Decals and Antiskid30787 22249 Available AntiskidMaintenance and Lubrication DE Door-Ease Lubrication Diagram 750 Cycles Maintenance and Lubrication Schedule750 Perform all procedures listed in previous section also Maintenance and Lubrication Schedule 4500 Cycles Consecutive 750Cycle Intervals Providing Access to the World Public Use Wheelchair Lifts