Braun NVL SERIES manual Cycles

Page 50

Maintenance and Lubrication Schedule

Perform all procedures listed in previous section also

4500

Cycles

Inspect cotter pins on platform pivot pin (2)

Hydraulic Fluid (Pump) - Check level. Note: Fluid should be changed if there is visible contamination. ,QVSHFWWKHK\GUDXOLFV\VWHP F\OLQGHUKRVHVÀW- WLQJVVHDOVHWF IRUOHDNVLIÁXLGOHYHOLVORZ

,QVSHFWF\OLQGHUVÀWWLQJVDQGK\GUDXOLFFRQQHFWLRQV for wear, damage or leaks

Inspect parallel arms, bushings and pivot pins for visible wear or damage

Inspect parallel arm pivot pin mounting bolts (8)

Inspect vertical arms, handrails and pivot pins for visible wear or damage

Inspect upper/lower fold arms, rotating pivot slide arms, slide support arms and associated pivot pins, bushings, and bearings for visible wear or damage

Resecure, replace or correct as needed

Use Braun 32840-QT (Exxon® Univis HVI 26) K\GUDXOLFÁXLG do not mix with Dextron III or other K\GUDXOLFÁXLGV &KHFNÁXLGOHYHOZLWKplatform lowered fully and roll stop unfolded fully. Fill WRZLWKLQßRIWKHERWWRPRIWKHßÀOOWXEH (neck).

Tighten, repair or replace if needed.

Replace if needed.

Tighten or replace if needed.

Replace damaged parts and lubricate if needed

Replace if needed.

Page 48

Image 50
Contents Operators Manual for Congratulations Contents Warranty and Registration Instructions Series No Pump Code Model No Serial NoWarranty and Registration Instructions Lift Terminology IllustrationIntroduction Lift Components Vehicle and Lift Interlocks UP Platform Raise Up is the action of the platform raising Lift Actions and FunctionsDown Platform Lower Lift Operation Safety Safety Symbols Safety FIRST! Know ThatLift Operation Safety Precautions RDGDQGXQORDGFOHDURIYHKLFXODUWUDIÀF Lift Operation Safety DXWKRULHG FHUWLÀHG VHUYLFHSHUVRQQHO Operation Notes and Details Press the switch labeled for the intended function Lift Features Disengaged Lift-Tite Latch Engagement Pin Roller When the Unfold switch is When the Fold switch is pressed Fully-Folded Fully-Unfolded Fully-Vertical Lift Passengers GLIÀFXOW\XVLQJVWHSVOperation Notes and Details Operation Notes and Details Operation Procedure Review Wheelchair-Equipped Occupant Seat BeltsPreventive Maintenance Lift Operating Instructions Open Doors and Secure To Unfold Platform Lift Operating Instructions To Load Passenger To Fold Platform Nhtsa Operations Checklist 9HULÀHGManual Operating Instructions Release Valve To Unfold Platform Out Down To LowerUp To Raise To Fold PlatformTo Store Pump Handle To Install Pump Cover Decals and Antiskid Lift is only as safe as30787 Available Antiskid 22249Maintenance and Lubrication DE Door-Ease Lubrication Diagram Maintenance and Lubrication Schedule 750 Cycles750 Perform all procedures listed in previous section also Maintenance and Lubrication Schedule 4500 Cycles Consecutive 750Cycle Intervals Providing Access to the World Public Use Wheelchair Lifts