Braun NVL SERIES manual Open Doors and Secure To Unfold Platform

Page 30

Lift Operating Instructions

Open Door(s) and Secure

To Unfold Platform:

Stand clear and press the UN- FOLD switch until the platform stops (reaches ÁRRUOHYHO- unfolds fully). Release switch.

Note: In event platform does not unfold, press FOLD switch to release Lift-Titelatches.

To Unload Passenger:

1.Read Note below! Load passen- ger onto platform and lock wheel- chair brakes.

Note: Passenger must be posi- tioned fully inside yellow bound- aries and outer barrier must be UP.

32525

UP FOLD

DOWN UNFOLD

32526

Page 28

Image 30
Contents Operators Manual for Congratulations Contents Warranty and Registration Instructions Series No Pump Code Model No Serial NoWarranty and Registration Instructions Lift Terminology IllustrationIntroduction Lift Components Vehicle and Lift Interlocks Lift Actions and Functions Down Platform LowerUP Platform Raise Up is the action of the platform raising Lift Operation Safety Safety Symbols Safety FIRST! Know ThatLift Operation Safety Precautions RDGDQGXQORDGFOHDURIYHKLFXODUWUDIÀF Lift Operation Safety DXWKRULHG FHUWLÀHG VHUYLFHSHUVRQQHO Operation Notes and Details Press the switch labeled for the intended function Lift Features Disengaged Lift-Tite Latch Engagement Pin Roller When the Unfold switch is When the Fold switch is pressed Fully-Folded Fully-Unfolded Fully-Vertical Lift Passengers GLIÀFXOW\XVLQJVWHSVOperation Notes and Details Operation Notes and Details Operation Procedure Review Wheelchair-Equipped Occupant Seat BeltsPreventive Maintenance Lift Operating Instructions Open Doors and Secure To Unfold Platform Lift Operating Instructions To Load Passenger To Fold Platform Nhtsa Operations Checklist 9HULÀHGManual Operating Instructions Release Valve To Unfold Platform Out Down To LowerUp To Raise To Fold PlatformTo Store Pump Handle To Install Pump Cover Decals and Antiskid Lift is only as safe as30787 Available Antiskid 22249Maintenance and Lubrication DE Door-Ease Lubrication Diagram Maintenance and Lubrication Schedule 750 Cycles750 Perform all procedures listed in previous section also Maintenance and Lubrication Schedule 4500 Cycles Consecutive 750Cycle Intervals Providing Access to the World Public Use Wheelchair Lifts