Braun NVL SERIES manual Maintenance and Lubrication Schedule

Page 49

Maintenance and Lubrication Schedule

1500

Cycles

continued

Make sure lift operates smoothly

Inspect external snap rings:

Handrail pivot pins (2 per pin)

Platform slide/rotate pivot pins (2 per pin)

Platform fold axles (1 per axle)

Inner roll stop lever bracket pins (1 per pin)

Lift-Titelatch gas (dampening) spring (2 per)

Outboard platform pivot pins (1 per pin)

Gear weldment pivot pins (1 per pin)

Inspect platform fold axles and bearings for wear or damage and positive securement

Inspect platform fold link rollers and bearings for wear or damage and positive securement

Remove pump module cover and inspect:

‡+\GUDXOLFKRVHVÀWWLQJVDQGFRQQHFWLRQVIRU wear or leaks

Harness cables, wires, terminals and connec- tions for securement or damage

Control board, circuit breaker, power switch and lights for securement or damage

Realign towers and vertical arms. Lubri- cate or correct as needed.

Resecure or replace if needed.

Replace damaged parts and resecure as needed. Apply Light Oil.

Resecure, replace or correct as needed. Note: Apply Loctite® to threads if needed.

Resecure, replace or correct as needed.

Page 47

Image 49
Contents Operators Manual for Congratulations Contents Series No Pump Code Model No Serial No Warranty and Registration InstructionsWarranty and Registration Instructions Illustration Lift TerminologyIntroduction Lift Components Vehicle and Lift Interlocks Down Platform Lower Lift Actions and FunctionsUP Platform Raise Up is the action of the platform raising Safety Symbols Safety FIRST! Know That Lift Operation SafetyLift Operation Safety Precautions RDGDQGXQORDGFOHDURIYHKLFXODUWUDIÀF Lift Operation Safety DXWKRULHG FHUWLÀHG VHUYLFHSHUVRQQHO Operation Notes and Details Press the switch labeled for the intended function Lift Features Disengaged Lift-Tite Latch Engagement Pin Roller When the Unfold switch is When the Fold switch is pressed Fully-Folded Fully-Unfolded Fully-Vertical GLIÀFXOW\XVLQJVWHSV Lift PassengersOperation Notes and Details Operation Notes and Details Wheelchair-Equipped Occupant Seat Belts Operation Procedure ReviewPreventive Maintenance Lift Operating Instructions Open Doors and Secure To Unfold Platform Lift Operating Instructions To Load Passenger To Fold Platform 9HULÀHG Nhtsa Operations ChecklistManual Operating Instructions Release Valve Down To Lower To Unfold Platform OutTo Fold Platform Up To RaiseTo Store Pump Handle To Install Pump Cover Lift is only as safe as Decals and Antiskid30787 22249 Available AntiskidMaintenance and Lubrication DE Door-Ease Lubrication Diagram 750 Cycles Maintenance and Lubrication Schedule750 Perform all procedures listed in previous section also Maintenance and Lubrication Schedule 4500 Cycles Consecutive 750Cycle Intervals Providing Access to the World Public Use Wheelchair Lifts