Braun NVL SERIES manual 750

Page 47

Maintenance and Lubrication Schedule

 

Inspect platform fold gear rack and gear weldment

Remove foreign objects, replace damaged parts

 

teeth for foreign objects, wear or damage (bent,

and resecure as needed

 

deformed or misaligned), positive securement and

 

750

proper operation

 

 

 

Cycles

Inspect lift for wear, damage or any abnormal

Correct as needed.

 

 

condition

 

 

Inspect lift for rattles

Correct as needed.

 

 

 

1500

Cycles

continued

Perform all procedures listed in previous sections also

Outer barrier pivot arm pivot points (2)

Apply Light Oil - See Lubrication Diagram

Upper and lower fold arm telescoping area

Apply Light Grease - See Lubrication Diagram

Platform pivot pin bearings (2)

Apply Light Oil - See Lubrication Diagram

Platform fold axles (2)

Apply Light Oil - See Lubrication Diagram

Inner roll stop lever bearings (2)

Apply Light Oil - See Lubrication Diagram

Inner roll stop lever slot (2)

Apply Light Oil - See Lubrication Diagram

Page 45

Image 47
Contents Operators Manual for Congratulations Contents Series No Pump Code Model No Serial No Warranty and Registration InstructionsWarranty and Registration Instructions Illustration Lift TerminologyIntroduction Lift Components Vehicle and Lift Interlocks UP Platform Raise Up is the action of the platform raising Lift Actions and FunctionsDown Platform Lower Safety Symbols Safety FIRST! Know That Lift Operation SafetyLift Operation Safety Precautions RDGDQGXQORDGFOHDURIYHKLFXODUWUDIÀF Lift Operation Safety DXWKRULHG FHUWLÀHG VHUYLFHSHUVRQQHO Operation Notes and Details Press the switch labeled for the intended function Lift Features Disengaged Lift-Tite Latch Engagement Pin Roller When the Unfold switch is When the Fold switch is pressed Fully-Folded Fully-Unfolded Fully-Vertical GLIÀFXOW\XVLQJVWHSV Lift PassengersOperation Notes and Details Operation Notes and Details Wheelchair-Equipped Occupant Seat Belts Operation Procedure ReviewPreventive Maintenance Lift Operating Instructions Open Doors and Secure To Unfold Platform Lift Operating Instructions To Load Passenger To Fold Platform 9HULÀHG Nhtsa Operations ChecklistManual Operating Instructions Release Valve Down To Lower To Unfold Platform OutTo Fold Platform Up To RaiseTo Store Pump Handle To Install Pump Cover Lift is only as safe as Decals and Antiskid30787 22249 Available AntiskidMaintenance and Lubrication DE Door-Ease Lubrication Diagram 750 Cycles Maintenance and Lubrication Schedule750 Perform all procedures listed in previous section also Maintenance and Lubrication Schedule 4500 Cycles Consecutive 750Cycle Intervals Providing Access to the World Public Use Wheelchair Lifts