Braun NVL SERIES manual Lift Operating Instructions

Page 31

A

32525

UP FOLD

DOWN UNFOLD

32526

C

Lift Operating Instructions

To Unload Passenger (continued):

2. Press DOWN switch until the en- tire platform reaches ground level (see Photo B) and the outer bar- rier unfolds fully (ramp position). See Photo C. Release switch.

3. Unlock wheelchair brakes and unload passenger from platform.

Note: Outer barrier must be fully unfolded (ramp position) until the entire wheelchair (or standee) has crossed the outer barrier. See Photos E and F on page 30 also.

B

D

Page 29

Image 31
Contents Operators Manual for Congratulations Contents Series No Pump Code Model No Serial No Warranty and Registration InstructionsWarranty and Registration Instructions Illustration Lift TerminologyIntroduction Lift Components Vehicle and Lift Interlocks Down Platform Lower Lift Actions and FunctionsUP Platform Raise Up is the action of the platform raising Safety Symbols Safety FIRST! Know That Lift Operation SafetyLift Operation Safety Precautions RDGDQGXQORDGFOHDURIYHKLFXODUWUDIÀF Lift Operation Safety DXWKRULHG FHUWLÀHG VHUYLFHSHUVRQQHO Operation Notes and Details Press the switch labeled for the intended function Lift Features Disengaged Lift-Tite Latch Engagement Pin Roller When the Unfold switch is When the Fold switch is pressed Fully-Folded Fully-Unfolded Fully-Vertical GLIÀFXOW\XVLQJVWHSV Lift PassengersOperation Notes and Details Operation Notes and Details Wheelchair-Equipped Occupant Seat Belts Operation Procedure ReviewPreventive Maintenance Lift Operating Instructions Open Doors and Secure To Unfold Platform Lift Operating Instructions To Load Passenger To Fold Platform 9HULÀHG Nhtsa Operations ChecklistManual Operating Instructions Release Valve Down To Lower To Unfold Platform OutTo Fold Platform Up To RaiseTo Store Pump Handle To Install Pump Cover Lift is only as safe as Decals and Antiskid30787 22249 Available AntiskidMaintenance and Lubrication DE Door-Ease Lubrication Diagram 750 Cycles Maintenance and Lubrication Schedule750 Perform all procedures listed in previous section also Maintenance and Lubrication Schedule 4500 Cycles Consecutive 750Cycle Intervals Providing Access to the World Public Use Wheelchair Lifts