Braun NVL SERIES manual Maintenance and Lubrication Schedule, Cycles

Page 46

Maintenance and Lubrication Schedule

750

Cycles

Outer barrier pivot points (2)

Outer barrier arm slots (2)

Outboard platform pivot pins (2)

Outboard platform rollers and pins

Platform fold link pivot pins

Platform fold link rollers and pins

Lift-Titelatches (tower pivot points - 2)

Lift-Titelatch gas (dampening) spring pivot points (2 springs - 4 points)

Inspect Lift-Titelatches and gas springs for wear or damage (bent, deformed or misaligned), posi- tive securement (external snap rings) and proper operation

Inspect outer barrier for proper operation

Apply Light Oil - See Lubrication Diagram

Apply Light Grease - See Lubrication Diagram

Apply Light Oil - See Lubrication Diagram

Apply Light Oil - See Lubrication Diagram

Apply Light Oil - See Lubrication Diagram

Apply Light Grease - See Lubrication Diagram

Apply Light Oil - See Lubrication Diagram

Apply Light Oil - See Lubrication Diagram

Resecure, replace damaged parts or otherwise correct as needed. Note: Apply Light Grease to Lift-Titelatch tower pivot point if replacing latch.

Correct or replace damaged parts.

Page 44

Image 46
Contents Operators Manual for Congratulations Contents Warranty and Registration Instructions Series No Pump Code Model No Serial NoWarranty and Registration Instructions Lift Terminology IllustrationIntroduction Lift Components Vehicle and Lift Interlocks Down Platform Lower Lift Actions and FunctionsUP Platform Raise Up is the action of the platform raising Lift Operation Safety Safety Symbols Safety FIRST! Know ThatLift Operation Safety Precautions RDGDQGXQORDGFOHDURIYHKLFXODUWUDIÀF Lift Operation Safety DXWKRULHG FHUWLÀHG VHUYLFHSHUVRQQHO Operation Notes and Details Press the switch labeled for the intended function Lift Features Disengaged Lift-Tite Latch Engagement Pin Roller When the Unfold switch is When the Fold switch is pressed Fully-Folded Fully-Unfolded Fully-Vertical Lift Passengers GLIÀFXOW\XVLQJVWHSVOperation Notes and Details Operation Notes and Details Operation Procedure Review Wheelchair-Equipped Occupant Seat BeltsPreventive Maintenance Lift Operating Instructions Open Doors and Secure To Unfold Platform Lift Operating Instructions To Load Passenger To Fold Platform Nhtsa Operations Checklist 9HULÀHGManual Operating Instructions Release Valve To Unfold Platform Out Down To LowerUp To Raise To Fold PlatformTo Store Pump Handle To Install Pump Cover Decals and Antiskid Lift is only as safe as30787 Available Antiskid 22249Maintenance and Lubrication DE Door-Ease Lubrication Diagram Maintenance and Lubrication Schedule 750 Cycles750 Perform all procedures listed in previous section also Maintenance and Lubrication Schedule 4500 Cycles Consecutive 750Cycle Intervals Providing Access to the World Public Use Wheelchair Lifts