Maintenance and Lubrication Schedule
4500
Cycles
Inspect gas springs (cylinders) for wear or damage, proper operation and positive securement
Inspect rotating pivot slide arm UHMW slide bear- ings
Inspect vertical arm plastic covers
Inspect power cable
Mounting
Decals and Antiskid
Tighten, replace or correct as needed
Apply
Resecure or replace if needed.
Resecure, repair or replace if needed.
Check to see that the lift is securely anchored to the vehicle and there are no loose bolts, broken welds, or stress fractures.
Replace decals if worn, missing or illegible. Re- place antiskid if worn or missing. See Decals and Antiskid section on pages
Consecutive
750Cycle Intervals
Repeat all previously listed inspection, lubrica- tion and maintenance procedures at 750 cycle intervals.
Page 49