Braun NVL SERIES manual Nhtsa Operations Checklist, 9HULÀHG

Page 34

NHTSA Operations Checklist

7KHIROORZLQJRSHUDWLRQVKDYHEHHQYHULÀHGXSRQ installation. This operational checklist can be used at any time to verify the lift is fully functional.

9HULÀHG

Vehicle movement is prevented unless the lift door is closed, ensuring the lift is stowed.

Lift operation shall be prevented unless the vehicle is stopped and vehicle movement is prevented.

The platform will not fold/stow if occupied.

The inner roll stop will not raise if occupied.

The outer barrier will not raise if occupied.

Lowering the plat- form beyond the in- ner roll stop locking position is allowed only when the inner roll stop is locked in position.

Lift platform move- ment shall be interrupted unless the outer barrier is raised and the outer barrier latch is positevely engaged.

WARNING

Discontinue lift use immediately if any lift or vehicle interlock does not operate properly. Failure to do so may result in serious bodily injury and/or property damage.

Verify platform lighting* when lift is deployed and pendant illumination when it is powered.

An audio warning (and visual warning for public lifts) will activate if the threshold area is occupied when WKHSODWIRUPLVDWOHDVWRQHLQFKEHORZÁRRUOHYHO

*Public use vehicle manufacturers are responsible for complying with the lift lighting requirements in Federal Motor Vehicle Safety Standard No. 404, Platform Lift Installations in Motor Vehicles (49 CFR 571.404).

Page 32

Image 34
Contents Operators Manual for Congratulations Contents Warranty and Registration Instructions Series No Pump Code Model No Serial NoWarranty and Registration Instructions Lift Terminology IllustrationIntroduction Lift Components Vehicle and Lift Interlocks Down Platform Lower Lift Actions and FunctionsUP Platform Raise Up is the action of the platform raising Lift Operation Safety Safety Symbols Safety FIRST! Know ThatLift Operation Safety Precautions RDGDQGXQORDGFOHDURIYHKLFXODUWUDIÀF Lift Operation Safety DXWKRULHG FHUWLÀHG VHUYLFHSHUVRQQHO Operation Notes and Details Press the switch labeled for the intended function Lift Features Disengaged Lift-Tite Latch Engagement Pin Roller When the Unfold switch is When the Fold switch is pressed Fully-Folded Fully-Unfolded Fully-Vertical Lift Passengers GLIÀFXOW\XVLQJVWHSVOperation Notes and Details Operation Notes and Details Operation Procedure Review Wheelchair-Equipped Occupant Seat BeltsPreventive Maintenance Lift Operating Instructions Open Doors and Secure To Unfold Platform Lift Operating Instructions To Load Passenger To Fold Platform Nhtsa Operations Checklist 9HULÀHGManual Operating Instructions Release Valve To Unfold Platform Out Down To LowerUp To Raise To Fold PlatformTo Store Pump Handle To Install Pump Cover Decals and Antiskid Lift is only as safe as30787 Available Antiskid 22249Maintenance and Lubrication DE Door-Ease Lubrication Diagram Maintenance and Lubrication Schedule 750 Cycles750 Perform all procedures listed in previous section also Maintenance and Lubrication Schedule 4500 Cycles Consecutive 750Cycle Intervals Providing Access to the World Public Use Wheelchair Lifts