Operation Notes and Details
Handrail Operating Instructions
1.Fold tall (yellow) outer barrier down.
2.a. Lift latch handle.
b.Deploy / Stow handrail.
c.Lower latch handle.
3.a. Lift latch handle.
b.Deploy / Stow handrail.
c.Lower latch handle.
JKA |
a.
| Latch | c. |
JKA | Handle |
|
Detail |
| |
b. |
|
Note: Order of procedures shown is for stowing lift. To deploy handrails and barrier after extending the platform, reverse order of procedures.
a.
c.
Latch
Handle
Detail
b.
JKA |
Page 21