Braun NUVL855RM24 manual Open Doors and Secure To Deploy Platform To Unload Passenger

Page 30

Lift Operating Instructions

OPEN DOOR(S) AND SECURE

TO DEPLOY PLATFORM:

TO UNLOAD PASSENGER:

1.Stand clear and press the UP switch until the platform extends fully. Release switch.

2.Lift handrail latch handles, deploy (lift) handrails up to vertical position and lower handrail latch handles fully.

3.Lift outer barrier to vertical position.

4.Latch handrail belt.

5.Press the UP switch until the platform stops (raises to floor level) and inner roll stop unfolds to floor level. Release switch.

1.Read Note below! Load passenger onto plat- form and lock wheelchair brakes.

Note: Passenger must be positioned fully inside yellow boundaries, outer barrier must be UP and handrail belt must be latched.

2. Press DOWN switch until the entire platform reaches ground level and the outer barrier un- folds fully (ramp position). Release switch.

3. Unlatch handrail belt, unlock wheelchair brakes and unload passenger from platform.

Note: Outer barrier must be fully unfolded (ramp position) until the entire wheelchair (or standee) has crossed the outer barrier.

Page 28

Image 30
Contents Under-Vehicle Lift Congratulations Contents Warranty and Registration Instructions Model NoModel No Serial No Series No Date of Manufacture Lift Terminology Illustration JKALift Terminology IntroductionLift Components Vehicle and Lift Interlocks Lift Terminology Lift Operation Safety Safety Symbols Safety FIRST! Know ThatLift Operation Safety Precautions Lift Operation Safety May result in serious Bodily injury and/or property damage Lift Operation Safety Lift Operation Safety Operation Notes and Details Hand-held Pendant Fully Deployed Fully Unfolded Operation Notes and Details Outer barriers do not operate Level for any reason contactOperation immediately if ProperlyBarrier, Handrail and Belt Manual Operation Handrail Operating Instructions Lift Passengers Operation Notes and Details Lift Passengers Wheelchair-Equipped Occupant Seat Belts Operation Procedure Review Preventive Maintenance Lift Operating Instructions Open Doors and Secure To Deploy Platform To Unload Passenger Close Doors Nhtsa Operations Checklist Safety Precautions at all times Manual Operating InstructionsDo not remove Manual Hand Pump Release ValveFigure a Down Unfold Outer Barrier OUT To Extend PlatformDown To Lower Platform UP To Fold Outer BarrierDecal Placement Decals and AntiskidDecals 34270 29884 31409 Anitskid Available AntiskidMaintenance and Lubrication DE Door-Ease Lubrication Diagram Maintenance and Lubrication Schedule 750 Cycles1500 Cycles Maintenance and Lubrication Schedule Maintenance and Lubrication Schedule 1500 Consecutive Providing Access to the World CJKA-**GB
Related manuals
Manual 38 pages 14.57 Kb