EAW DSA230i, DSA250i owner manual Initial Set-Up, Acoustical Installation

Page 31

2.Install at least one of the supplied 1/4-20 X 3 in Retainer Bolts with its lock washer through the side of either the top or bottom Wall/Enclosure Bracket and snugly tighten. The bolt threads into a weld nut on the side of the Wall Bracket. This Retainer Bolt prevents the enclosure from being lifted off the Wall Brackets without first removing the bolt. Note that the Retainer Bolt does not “clamp” or support anything. It serves only to retain the enclosure on the wall brackets, not to lock it into position.

CABLE CHANNELS

3. Route cabling as required using the rear channels in the enclosure’s extrusion.

1/4-20 X 3 LG HEX HEAD SCREW & LOCK WASHER

1/4-20 WELD NUT

Figure 5.6.9b Retainer Bolt Installation

Figure 5.6.9c Cable Routing

5.7 Initial Set-Up

ENCLOSURE BRACKET BOLT

4. Rotate the enclosure to the desired horizontal angle. Firmly tighten each Enclosure Bracket Bolt to secure the enclosure in the desired position.

5.7.1 VERIFY MODULE ORIENTATION AND POSITION

Figure 5.6.9d Secure the Enclosure Position

Using DSAPilot and with communications established with the modules, click on each module in DSAPilot. The LED in both the DSAPilot graphic and on the actual module will illuminate. Ensure it is the correct module and that its physical orientation, and, if applicable, its position in a cluster corresponds to that shown in the DSAPilot graphic. See the DSAPilot help file for further information.

CAUTION: Incorrect orientation or cluster position will result in poor to unusable performance.

LED INDICATOR

5.8 Acoustical Installation

Figure 5.7.1 Identification LED

Adjustment of the signal processing and thus the acoustical performance for each DSAi Cluster is accomplished using the DSAPilot software. Complete instructions for its use can be found in the DSAPilot Help file.

These are the basic tasks that need to be done using DSAPilot:

1.Select each cluster configuration used in the system design.

2.Assign the installed clusters to those selected in DSAPilot.

3.Set the Steering parameters for each cluster.

4.Configure the audio input routing for each cluster.

5..Set the user-adjustable gain, EQ, compression, or signal delay for the inputs.

6.Set the desired Power Saving operation.

7.Save the final signal processing settings for the system to a file.

27

Image 31
Contents Page Safety Precautions Read this First Precauciones DE Seguridad LEA Esto Primero EC Declaration of Conformity Contents Page Shipping Damage ContentsIntroduction UnpackingQuick Start Audio Signal ConnectionChapter Returning Products to EAWAC Mains Installation Daisy Chaining Audio and Computer Signal Between ModulesComputer Control Connection Signal End / Power End Physical InstallationDescription Signal ProcessingSystem Overview 4 DSAi Block Diagrams FeaturesElectronic Engineering Design Applications4a Angled Radiation Pattern Designing DSAi Systems DSAPilotLow Frequency Performance Comparison to Traditional ProductsAnalog Audio and EIA-485 Computer Control Installation2 Audio a & Audio B Recommended Conductor Gauge AWG to 18 AWG / 0.2 mm to 1 mm CobraNet Audio and Computer Control 3 Basic CobraNet DiagramCabling Fault Detect Supervisory Monitoring 3a Single DSAi Fault on 2 PowerCon Plug AC Mains Power Connection4 Fuse Grounding2 Signal End / Power End 3 DSAi Cluster Configurations 4a Wall Mounted 6 Mounting Height Lift the enclosure onto the structure-mounted Wall Brackets Initial Set-Up Acoustical InstallationOperational Functions OperationSignal Monitoring Normal Operation Operational Check ListOperational ‘DOS’ and ‘DONTS’ How to Contact EAW Maintenance and ServiceWarranty Service ItemsAppendices Inspections and MaintenanceDSA250i Only TroubleshootingEIA-485 CobraNet EIA-485 Network NotesSupport For CobraNet Support For EthernetDSAi Connections 3a EIA-485 Example 5c Example One path was to the EIA-485 port. So when B responds 6c Example Right Side Back Mechanical DrawingsRight Side Wall Bracket Full Scale