Lincoln Electric D1.8 manual Appendices

Page 24

24

D1.8 Seismic Supplement Welding Manual

Appendices

The following appendices reference the required documentation required to support the use of suggested Lincoln Electric products for D1.8 Demand Critical applications. Check with your Lincoln Electric sales representative, authorized distributor or the Lincoln Electric website at www.lincolnelectric.com for more information.

Appendix A: D1.8 Certifications

Appendix B: Intermix Testing Results

Appendix C: Lot Control Alternative Documentation

www.lincolnelectric.com

Image 24
Contents D1.8 Seismic Supplement Welding Manual Table of Contents IntroductionDocument Updates Customer Assistance PolicyBackground D1.8 Seismic Supplement Welding Manual Specifications AWS D1.8 and Other SpecificationsAWS D1.8 and Aisc Specifications Purpose and Use of This ManualAWS D1.8 and Other AWS Standards AWS D1.8 and Contract DocumentsAWS D1.8 and Fema Content Overview of D1.8New Terminology See D1.8, clause Three Kinds of WeldsDifferences between Fema 353 and AWS D1.8 Differences between AWS D1.8/D1.8M2005 and AWS D1.8/D1.8MUser’s Guide to AWS D1.8 EngineersStructural Detailers Fabricators and ErectorsWelder Qualification D1.8 Seismic Supplement Welding Manual Welding Procedure Specifications WPSs Filler Metals GeneralFiller Metals All D1.8 Welds Filler Metals Demand Critical WeldsSee D1.8, clause Techniques Inspectors Regarding Welder QualificationRegarding Filler Metals Regarding Production WeldingRegarding Structural Details Regarding the Protected ZoneLincoln Electric Products D1.8 Seismic Supplement Welding Manual Exposure Testing Heat Input Limits for Demand Critical WeldsHeat Input Limits for Demand Critical Welds cont’d Appendices Additional Certificates Available Online Smaw and Gmaw Certificates of ConformanceMetal-Cored Wire Meets ALL Requirements of AWS D1.82009 Meets ALL Requirements of AWS D1.82009 Meets ALL Requirements of AWS D1.82009 Meets ALL Requirements of AWS D1.82009 Meets ALL Requirements of AWS D1.82009 Meets ALL Requirements of AWS D1.82009 Meets ALL Requirements of AWS D1.82009 Meets ALL Requirements of AWS D1.82009 Meets ALL Requirements of AWS D1.82009 Meets ALL Requirements of AWS D1.82009 Meets ALL Requirements of AWS D1.82009 Meets ALL Requirements of AWS D1.82009 Meets ALL Requirements of AWS D1.82009 Appendix B Intermix Testing D1.8 Seismic Supplement Welding Manual Appendix C Alternative To Production Lot Testing D1.8 Seismic Supplement Welding Manual D1.8 Seismic Supplement Welding Manual D1.8 Seismic Supplement Welding Manual District Sales Offices Automation Division