Lincoln Electric D1.8 manual Appendix B Intermix Testing

Page 40

40

D1.8 Seismic Supplement Welding Manual

Appendix B:

Intermix Testing

When FCAW-S is intermixed with welds made by processes other than FCAW-S, the intermixed zone must be tested in accordance with Annex B of AWS D1.8. This testing can be performed by the filler metal manufacturer, the customer, or by a third party. The results for intermixed weld metal tested by Lincoln Electric are listed as follows:

www.lincolnelectric.com

Image 40
Contents D1.8 Seismic Supplement Welding Manual Table of Contents IntroductionDocument Updates Customer Assistance PolicyBackground D1.8 Seismic Supplement Welding Manual Specifications AWS D1.8 and Other SpecificationsAWS D1.8 and Aisc Specifications Purpose and Use of This ManualAWS D1.8 and Contract Documents AWS D1.8 and Other AWS StandardsAWS D1.8 and Fema Overview of D1.8 ContentNew Terminology See D1.8, clause Three Kinds of WeldsDifferences between Fema 353 and AWS D1.8 Differences between AWS D1.8/D1.8M2005 and AWS D1.8/D1.8MUser’s Guide to AWS D1.8 EngineersFabricators and Erectors Structural DetailersWelder Qualification D1.8 Seismic Supplement Welding Manual Welding Procedure Specifications WPSs Filler Metals GeneralFiller Metals All D1.8 Welds Filler Metals Demand Critical WeldsSee D1.8, clause Techniques Inspectors Regarding Welder QualificationRegarding Filler Metals Regarding Production WeldingRegarding Structural Details Regarding the Protected ZoneLincoln Electric Products D1.8 Seismic Supplement Welding Manual Exposure Testing Heat Input Limits for Demand Critical WeldsHeat Input Limits for Demand Critical Welds cont’d Appendices Additional Certificates Available Online Smaw and Gmaw Certificates of ConformanceMetal-Cored Wire Meets ALL Requirements of AWS D1.82009 Meets ALL Requirements of AWS D1.82009 Meets ALL Requirements of AWS D1.82009 Meets ALL Requirements of AWS D1.82009 Meets ALL Requirements of AWS D1.82009 Meets ALL Requirements of AWS D1.82009 Meets ALL Requirements of AWS D1.82009 Meets ALL Requirements of AWS D1.82009 Meets ALL Requirements of AWS D1.82009 Meets ALL Requirements of AWS D1.82009 Meets ALL Requirements of AWS D1.82009 Meets ALL Requirements of AWS D1.82009 Meets ALL Requirements of AWS D1.82009 Appendix B Intermix Testing D1.8 Seismic Supplement Welding Manual Appendix C Alternative To Production Lot Testing D1.8 Seismic Supplement Welding Manual D1.8 Seismic Supplement Welding Manual D1.8 Seismic Supplement Welding Manual District Sales Offices Automation Division