Friedrich 000 BTU'S service manual VEA 09/12/18 with 2.5 KW, 3.4 KW or 5KW, Electric Heat

Page 46

COOL WITH ELECTRIC HEAT

ELECTRICAL & THERMOSTAT WIRING DIAGRAM

VEA 09/12/18 with 2.5 KW, 3.4 KW or 5KW

ELECTRIC HEAT

NOTE: THE DIAGRAM ABOVE, ILLUSTRATES THE TYPICAL THERMOSTAT WIRING FOR TWO SPEED FAN OPERATION. SEE THE UNIT CONTROL PANEL FOR THE ACTUAL UNIT WIRING DIAGRAM AND SCHEMATIC.

44

Image 46
Contents Single Package Vertical Air Conditioning System Technical Support Contact Information Table of Contents Important Safety Information Your safety and the safety of others are very importantRefrigeration System Hazards Introduction Property Damage HazardsSerial Number Identification Guide Chassis Specifications Electric Heat DataExtended Cooling Performance VEA Extended Cooling PerformanceVEA/VHA09-24 VEA Extended Cooling Performance Electrical Requirements Electric Shock HazardRemote Thermostat and Low Voltage Control Connections RT5 Two speed fan RT4 One speed fanThermostat Connections Electronic Control Board Features Quiet Start/StopElectronic Control Configuration Diagnostics Electronic control error codes diagnostics and test modeTest Mode Power On and Off Features on the Electronic Control Cool mode control features for cool with electric heat units Compressor operation depends on t-stat settings Component description / A-Series specifications VERT-I-PAK Single Packaged Vertical AIR ConditionersExternal Static Pressure Indoor Airflow Data Capacitor Check with Capacitor Analyzer Components TestingCapacitors Capacitor ConnectionsHeater Elements and Limit SWITCHES’ Specifications Components TestingDrain PAN Valve Refrigeration Assembly Refrigeration Sequence of OperationService CUT/SEVER HazardEquipment Must be Capable Sealed Refrigeration System RepairsEquipment Required Risk of Electric ShockBurn Hazard Method Of Charging / RepairsFreeze Hazard Undercharged Refrigerant Systems Overcharged Refrigerant SystemsRestricted Refrigerant System Check Valve Hermetic Components CheckMetering Device Capillary Tube SystemsReversing Valve DESCRIPTION/OPERATION Testing the Coil Checking the Reversing ValveFire Hazard Procedure For Changing Reversing ValveTouch Test in Heating/Cooling Cycle Explosion HazardCompressor Checks Ground Test Single Phase Resistance TestChecking Compressor Efficiency Recommended procedure for compressor replacement Compressor ReplacementHigh Temperatures Rotary Compressor Special Troubleshooting and Service Blower Wheel / Housing / Condenser FAN / Shroud Routine MaintenanceCoils and Base PAN Excessive Weight Hazard AIR FilterFront Cover Routine MaintenanceSleeve / Drain Condensate Disposal SystemElectrical Troubleshooting Chart Cooling 9K BTU, 12K BTU, & 18K BTUElectrical Troubleshooting Chart Cooling 24K BTU Circuit Breakers areElectrical Troubleshooting Chart Heat Pump Heat Pump ModeTroubleshooting Chart Cooling Troubleshooting Chart HeatingVEA 09/12/18 with 2.5 KW, 3.4 KW or 5KW Electric HeatVHA 09/12/18 with 2.5 KW, 3.4 KW or 5KW Cool with Electric Heat Heat Pump with Electric Heat Cool with Electric Heat Heat Pump with Electric Heat Outdoor Coil Return Air Indoor Coil Wall Plenum AccessoriesDrain PAN Friedrich Air Conditioning Company Technical Support Contact Information Friedrich AIR Conditioning CO