Section 5 • Maintenance/Service
23. Check the clearance between the entire gate rotor blade and the shelf, rotate the gate rotor to find the tightest spot. It should be between
24. After clearance has been set install a new
25. Install side cover with a new gasket. Tighten the bolts to the recommended torque value. The unit can then be evacuated and leak checked.
Check for
gate rotor blade and partition.