Section 3 • Installation
Leveling and Grouting | recommendations for setting, precautions, mixing, and | |
The unit should be level in all directions. Wet the | grout placement, finishing and curing. The grout must | |
be worked under all areas of the feet with no bubbles or | ||
concrete pad according to the grout manufacturer’s | ||
voids. If the grout is settled with a slight outside slope, | ||
directions. Mix a sufficient amount of grout. The grout | ||
oil and water can run off of the base. Once the grout has | ||
must be an expanding grout rather than shrinking to | ||
cured, torque the anchor bolts as per HILTI instructions. | ||
provide a tighter bond. Follow the manufacturer’s | ||
|
G.A.
G.A.
COMPRESSOR UNIT
CENTER LINE OF
GAS COMPRESSION
SYSTEM
EL. TOP OF
GRADE |
6" |
# 6 @ 12"
EACH WAY TOP & BOTTOM
EXCAVATE TO FROST DEPTH AS REQ'D AND BACKFILL
WITH CLSM OR
Figure
|
|
|
|
|
| ISOLATION JOINT, |
|
|
|
|
|
| |
|
|
|
|
|
| 1" MINIMUM |
COMPRESSOR UNIT |
| CHAMFER EDGE |
|
|
| THICKNESS |
|
| |||||
| ||||||
FOUNDATION |
|
|
|
|
|
|
CONCRETE
SLAB IN
6” BUILDING
Figure
VSG/VSSG • Installation, Operation and Maintenance Manual •Vilter/Emerson • 35391SSG | 3 – 7 |