Sterling operating instructions SSV 05/R General information

Page 15

SSV 05/R

2.1. General information

Unpack all parts of the single conveyor unit and make sure that everything is available:

conveyor hopper with level probe (A)

control and maintenance unit (B)

injector tube (C)

supply hose (D) with 2 hose clamps

compressed-air hose (E)

operating instructions

SM4-605

D

A

E

1

0

B

C

Installation instructions 14

Image 15
Contents Sterling Material Processing Operating Instructions Single Conveyor Unit SSV 05/RTechnical service SSV 05/R Sterling Material ProcessingEdition 08/99 SSV 05/R Parts and Service Department Table of contents SSV 05/R Technical data Safety instructions Safety instructionsSSV 05/R SSV 05/R Explanations and information SSV 05/R For your safety SSV 05/R SSV 05/R SSV 05/R For the safety of the units Installation instructions SSV 05/R General information SSV 05/R Installing the conveyor hopper SSV 05/R Installing the control and maintenance unit SSV 05/R Connecting the compressed-air supply SSV 05/R Electrical connection Functional description SSV 05/R Method of functioning Control and maintenance unitSet-up Filling level too high Basic setting of the filling level in the conveyor hopperSSV 05/R Preparations Filling level too lowSet-up Maintenance SSV 05/R SSV 05/R Maintenance intervals Disassembly SSV 05/R Cleaning/replacing the filter cartridgeAdjusting the level probe SSV 05/R AssemblyTest steps SSV 05/R Trouble-shooting Problem RemedyTechnical data SSV 05/R Dimension sheet SSV 05/R Spare parts list SSV 05/R Pos Designation ID-No Maintenance and control unit Designation ID-No