Sterling operating instructions SSV 05/R Installing the control and maintenance unit

Page 17

SSV 05/R

2.3. Installing the control and maintenance unit

Install the control and maintenance unit at a freely accessible site. Observe the length of the connection cable and of the supplied hoses to the injector tube.

1

0

F

During installation, observe the length of the supply lines.

SM4-605

Installation instructions 16

Image 17
Contents Sterling Material Processing Operating Instructions Single Conveyor Unit SSV 05/REdition 08/99 Technical serviceSSV 05/R Sterling Material Processing SSV 05/R Parts and Service Department Table of contents SSV 05/R Technical data Safety instructions Safety instructionsSSV 05/R SSV 05/R Explanations and information SSV 05/R For your safety SSV 05/R SSV 05/R SSV 05/R For the safety of the units Installation instructions SSV 05/R General information SSV 05/R Installing the conveyor hopper SSV 05/R Installing the control and maintenance unit SSV 05/R Connecting the compressed-air supply SSV 05/R Electrical connection Functional description SSV 05/R Method of functioning Control and maintenance unitSet-up SSV 05/R Preparations Basic setting of the filling level in the conveyor hopperFilling level too low Filling level too highSet-up Maintenance SSV 05/R SSV 05/R Maintenance intervals Disassembly SSV 05/R Cleaning/replacing the filter cartridgeAdjusting the level probe SSV 05/R AssemblyTest steps SSV 05/R Trouble-shooting Problem RemedyTechnical data SSV 05/R Dimension sheet SSV 05/R Spare parts list SSV 05/R Pos Designation ID-No Maintenance and control unit Designation ID-No