Sterling SSV 05/R operating instructions Set-up

Page 24

SSV 05/R

4.2.1. Fine adjustment of the filling level in the conveyor hopper

&

Before the fine adjustment, carry through a basic adjust- ment.

During operation, carefully turn the ad- justment screw (A) of the level probe by means of a screwdriver until the desired filling level is reached.

A

&

Clockwise rotation makes the filling level fall.

Counterclockwise rotation makes the filling level rise.

If the filling level in the conveyor hopper cannot be lowered far enough by means of the level probe, the pressure on the control and maintenance unit can be re- duced step by step.

SM4-605

Set-up 23

Image 24
Contents Operating Instructions Single Conveyor Unit SSV 05/R Sterling Material ProcessingTechnical service SSV 05/R Sterling Material ProcessingEdition 08/99 SSV 05/R Parts and Service Department Table of contents SSV 05/R Technical data Safety instructions Safety instructionsSSV 05/R SSV 05/R Explanations and information SSV 05/R For your safety SSV 05/R SSV 05/R SSV 05/R For the safety of the units Installation instructions SSV 05/R General information SSV 05/R Installing the conveyor hopper SSV 05/R Installing the control and maintenance unit SSV 05/R Connecting the compressed-air supply SSV 05/R Electrical connection Functional description Control and maintenance unit SSV 05/R Method of functioningSet-up Basic setting of the filling level in the conveyor hopper SSV 05/R PreparationsFilling level too low Filling level too highSet-up Maintenance SSV 05/R SSV 05/R Maintenance intervals SSV 05/R Cleaning/replacing the filter cartridge DisassemblySSV 05/R Assembly Adjusting the level probeSSV 05/R Trouble-shooting Problem Remedy Test stepsTechnical data SSV 05/R Dimension sheet SSV 05/R Spare parts list Maintenance and control unit Designation ID-No SSV 05/R Pos Designation ID-No