Grizzly owner manual Model G0637 Control Box, Model G0638 Control Box

Page 28

9.Secure the collection drum lids to the collec- tion drums with the lid latches.

10.Connect the dust collection drum assemblies to the funnel port with the 9" flexible ducts and 9" duct clamps (see Figure 38).

Figure 38. Dust collection drum assemblies

connected to funnel port.

Model G0637 Control Box

1.Mount the control box onto the lower stand brace with (2) 38"-16 x 34" hex bolts, (4) 38" flat washers, and (2) 38"-16 hex nuts (see Figure 39).

Figure 39. Model G0637 control box mounted.

Note: The remote control uses IR (infrared) to communicate with the control box, and must have direct line-of-sight to the control box. Locate the control box with this in mind.

-26-

Model G0638 Control Box

1.Mount the control bracket onto the lower stand brace with (2) 38"-16 x 34" hex bolts, (4) 38" flat washers, and (2) 38"-16 hex nuts (see Figure 40).

Figure 40. Model G0638 control box bracket

mounted.

2.Open the control box and identify the four mounting holes in the back of the cabinet.

3.Attach the control box to the bracket already mounted on the stand brace with (4) M6-1 x 15 Phillips head screws, (4) 6mm flat wash- ers, and (4) M6-1 hex nuts (see Figure 41).

Figure 41. Model G0638 control box mounted.

G0637/G0638 Cyclone Dust Collector

Image 28
Contents 71/2 & 10 HP Cyclone Dust Collectors Model G0637Page Table of Contents Foreword IntroductionContact Info G0637 Machine Data Sheet G0637 Data Sheet G0637/G0638 Cyclone Dust Collector G0638 Machine Data Sheet G0638 Data Sheet G0637/G0638 Cyclone Dust Collector Identification G0637/G0638 Cyclone Dust Collector G0637/G0638 Cyclone Dust Collector Additional Safety for Dust Collectors Phase Converter Connection to PowerCircuit Requirements Full Load Amperage DrawModel G0638 440V Conversion Model G0637 440V ConversionTo convert the G0638 to Setup Setup SafetyItems Needed for Setup UnpackingInventory Figures Qty InventoryInventory Qty Placement Location Site ConsiderationsFloor Load LightingMounting to Shop Floor Clean UpBolting to Concrete Floors Hardware Identification Chart Assembly Upper StandIntake Cylinder and Blower Housing Intake Barrel and Large Cyclone FunnelBlower Housing and Intake Barrel Assemblies Cyclone mounting bracket mounted To collector assemblySecuring intake barrel assembly to Blower housing assembly Outlet Port and Canister Filters Canister filter collection bag installed Small Cyclone Funnel and Funnel Port Dust Collection Drum AssembliesPage Model G0637 Control Box Model G0638 Control BoxTo test run your dust collection system Test RunFor the G0638 only Designing System GeneralDuct Material Metal DuctFlexible Duct Plastic DuctSystem Design Decide Who Will DesignSketch Your Shop Layout Sketch a Basic Duct LayoutMachine Approximate Determine Required CFM of Each MachineMachine Determining Branch Line Duct Size Determining Main Line Duct SizeTotal CFM Branch Line Size Calculating Duct Resistance System Grounding Blast Gate Accessories Metal Duct Starter KitMetal Elbows Metal BranchesReducers & Adapters G6252-4 Floor Sweep G7341-5 Floor Sweep G7342-6 Floor SweepDust collection pipe clamps H2443-Universal AdapterRemote Control Operation SafetyOperations Maintenance Cleaning FiltersSchedule Emptying DrumsTroubleshooting ServiceMotor & Electrical Symptom Possible Cause Possible Solution Dust Collector OperationService Log Date Approximate Hours Of Use Service PerformedG0637 Electrical Components Model G0637 control boxWiring Diagrams Pages 44 G0638 Electrical Components Model G0638 control boxPages 47 Pages 47 Parts Breakdown Parts List DescriptionCollection Drum LID Label Placement Warranty and Returns Page Page