Cisco Systems ASA5512AW1YPR, ASA5515K9, kygjygcjgf, ASA5525IPSK9 Installing and Connecting the ASA

Page 53

Chapter 3 Installing and Connecting the ASA 5500-X

Connecting Cables, Turning on Power, and Verifying Connectivity

Step 3 Connect the power cord to the ASA, and connect the other end to your power source.

Step 4 For newer ASAs, the power turns on automatically when you plug in the power cable; do not press the power button on the front panel.

For older ASAs, press the power button.

Step 5 Check the Power LED on the front of the ASA chassis. When it is solid green, the ASA is powered on.

Step 6 Check the Status LED on the front of the ASA chassis. When it is solid green, the ASA has passed power-on diagnostics.

Cisco ASA 5500-X Series Hardware Installation Guide

3-15

Image 53
Contents Cisco ASA 5500-X Series Hardware Installation Guide Page N T E N T S System Installing and Removing SSDs Contents Cisco ASA 5500-X Series Hardware Installation Guide Document Conventions ContentsDocument Objectives Viii Installation WarningsCisco ASA 5500-X Series Hardware Installation Guide Cisco ASA 5500-X Series Hardware Installation Guide Circuit Breaker 15A Warning Related Documentation Where to Find Safety and Warning InformationXiii Xiv Information about the ASA Internal and External USB Flash Drives Cisco ASA 5500-X Series Chassis OverviewInternal USB Drive Optional External USB DrivesOnline Insertion and Removal Support Solid State DrivesFAT 32 File System Viewing Flash MemoryManagement 0/0 Interface Alarm LEDSFP Modules ASA 5500-X I/O CardsDescription ASA Chassis PanelsFront Panel LEDs VPN 13 12 HD1 Rear Panel LEDsLED See the Management 0/0 Interface section on Rear Panel Ports7shows the rear panel ports for the ASA 5545-X and ASA Power Supply AC Power Supply and DC Power Supply Hardware Specifications RJ-45 Console Cable Console Cable PinoutsASA Non-Operating Conditions9shows the RJ 45 cable Signal PinRJ-45 to DB-9 Console Adapter Signal RJ-45 Pin DB-9 PinSafety Recommendations Installation OverviewMaintaining Safety with Electricity Working in an ESD Environment General Site RequirementsPreventing Electrostatic Discharge Damage Site Environment Preventive Site ConfigurationPower Supply Considerations Locale Part Number Length Plug Rating Appliance Coupler AC Power SupplyCAB-IND-10A Configuring Equipment RacksRack Mounting Guidelines Rack Mounting the ChassisDetailed Steps Airflow Direction Detailed Steps See Figure Tools Required Verify the Box ContentsVerify the Rack Type Front 330905 No additional hardware is necessary for the rear adapter Secure the other outer slide rail to the rack Round and Square Hole RacksThreaded Hole Racks Secure the chassis to the rack with the front captive screws Guidelines Network Management PC Unsecured Secured Installing and Connecting the ASA Page Removing the Chassis Cover Removing and Replacing the Chassis CoverRemoving the Chassis Cover Replacing the Chassis CoverReplacing the Chassis Cover Installing an I/O CardI/O Card Location Removing the Regex Cable Connector Index finger placement Thumb placement Pushing the cover toward the rear of the chassis 10 Removing the Regex Cable Connector 11 Lift the I/O Card Upward to Release it Close the green connector clamp Installing the SFP Module Installing and Removing the SFP ModulesMylar tab Actuator/Button Bale-clasp Plastic collar Removing the SFP ModuleRemoving and Installing the AC Power Supply Removing and Installing the Power Supply16 Removing the Slot Cover 19 Back Power Supply Indicators Installing the DC Input PowerFixed fan Fixed DC power supply 22 Stripping the DC Input Power Source Wire 24shows the DC power supply with lead wires 25 Complete DC Secure Tie Wrap Removing and Installing the DC Power Supply26 Removing the Slot Cover Installation Scenarios Installing and Removing the Solid State Drive for30 Removing the SSD from the ASA 5512/5515/5525-X Installing and Removing SSDs32 Installing the SSD in the ASA 5512/5515/5525-X Page Numerics IN-2