Sanyo KS1872 installation instructions How to Test Run the Air Conditioner

Page 22

How to Test Run the Air Conditioner

After turning on power to the air conditioner, use the remote controller and follow the steps below to conduct the test run.

(1)Set the remote controller in Test Run mode. (Fig. 59a)

a)Press and hold the ION button.

b)Then press and hold the 1HR TIMER button.

c)At the same time, press the ACL (reset) button once. Use a pointed object such as the tip of a pen to press the ACL button.

• After a few seconds, “ ” appears and “oP-1” blinks in

the remote controller display area.

ON/OFF operation

ION

button

button

1HR.

(Fig. 59b)

d)Release the 1HR TIMER button.

e)Release the ION button.

(2)Start Cooling mode test run by pressing the ON/OFF operation button of the remote controller. (Fig. 59a)

This starts the fan producing uncooled forced air with

 

the 4 indicator lamps (OPERATION lamp, TIMER

 

lamp, QUIET lamp, and ION lamp) on the main unit

 

blinking. (Fig. 59c)

After 3 minutes, the system shifts into cooling opera-

 

tion, and cool air will start to be felt. Cool mode test

 

run is unaffected by the room temperature.

A

TIMER button

ACL (Reset) button

(3)

Press the ON/OFF operation button of the remote con-

 

troller again to stop the test run. (Fig. 59a)

(4)

Finally press the ACL (reset) button of the remote con-

 

troller to release it from Test Run mode to return to nor-

 

mal mode. (Fig. 59a)

 

• “ ” and “oP-1” will disappear from the remote con-

 

troller display area.

IMPORTANT

After the test run is completed, be sure to press the ACL (reset) button to return to normal mode. The air conditioner will not operate correctly if this is not done.

Fig. 59a

Fig. 59b

OPERATION lamp

TIMER lamp

QUIET lamp ION lamp

Fig. 59c

22

Image 22
Contents Installation Instructions Contents…In a Room For safe installation and trouble-free operation, you must…In a Ceiling or Wall …In Moist or Uneven LocationsGeneral Tools Required for Installation not suppliedAccessories Supplied with Unit Table Optional Copper Tubing KitAdditional Materials Required for Installation Installation Site SelectionIndoor Unit C1872, CL1872 Outdoor UnitC2472, CL2472 Baffle Plate for the Outdoor Unit CLxx models only Remove the Rear Panel from the Unit How to Install the Indoor UnitTrical wiring or conduits are Make a HoleIf Wooden Wall Install the Rear Panel on the WallIf Block, Brick, Concrete or Similar Type Wall How to remove the grille Remove the Grille to Install the Indoor UnitHow to replace the grille Wiring Instructions General precautions on wiring Shape the Indoor Side TubingRecommended Wire Length and Diameter AWGWiring Instructions for Inter-unit Connections For Outdoor Unit For solid core wiring or F-cable How to connect wiring to the terminal For Indoor UnitFor stranded wiring Mounting Right-side tubingDrain hose Switching drain hose and drain capLeft-side tubing Drain capTo unmount indoor unit Do not supply power toTubing and wiring to the out Unit or operate it until allHow to Install the Outdoor Unit Wiring Instructions for the Outdoor UnitRefrigerant Tubing Flaring Procedure with a Flare ToolUse of the Flaring Method Finishing the Installation Connecting Tubing between Indoor and Outdoor UnitsInsulation of Refrigerant Tubing Air Purging Be sure to completely insert Hex wrench beforeHow to Test Run the Air Conditioner Basic Functions of the Service Valves Pump DownTo take out the remote control unit, pull it forward Remote Control Unit Installation PositionMounting on a Wall Address Switch Address Setting of the Remote Control Unit