Sega 999-1108 owner manual Ratchet Handle KEY Master

Page 18

When carrying out the assembling and installation, follow the following 6-item sequence.

1

2

3

4

SECURING IN PLACE (ADJUSTER ADJUSTMENT)

POWER SUPPLY CONNECTION

TURNING POWER ON

ASSEMBLING CHECK

The master key (accessories) in addition to the tools such as a Phillips type screwdriver, wrench, socket wrench and Ratchet Handle are required for the assembly work.

Phillips type screwdriver

24mm

WRENCH (for M16 hexagon bolt)

SOCKET WRENCH,(M8 hexagon bolt)

RATCHET HANDLE

KEY MASTER

11

Image 18
Contents Manual no Warranty Before Using the PRODUCT, be Sure to Read the Following Page Table of Contents Specifications Definition of Location Maintenance MAN and Serviceman Locations Maintenance ManHandling Precautions Precautions Concerning Installation Location Limitations of Usage RequirementsOperation Area Precautions to be Heeded Before Starting the Operation OperationPage Page Accessories Description Flex Tube Assy Fiber Cable HOW to USE the Carton BOX Assembling and Installation Ratchet Handle KEY Master Securing in Place Adjuster Adjustment Bottom ViewPower SUPPLY, and Earth Connection AC unitHOW to USE the Cord Clamp Network check screen Memory Test Sound Test Input TestOutput Test Precautions to be Heeded When Moving the Machine Contents of Game HOW to Play Page NAMEENTRYscreen Page Explanation of Test and Data Display Memory InstallationMachine PeriodicSwitch Unit and Coin Meter Switch UnitTest Button Service ButtonSound Volume Coin MeterSystem Test Mode System Test Mode Menu RAM TestJVS Test Main Speaker Left Main Speaker RightOption Speaker Left 234567890123456789012345678PRESS Test Button to Exit R.T. TestSystem Assignments Service Type COMMON, IndividualCommunication Mode MASTER, SLAVE, RELAY, no Link Cabinet Type 1PLAYER ~ 8PLAYERSCoin Assignments Manual Setting Setting ExampleCoin to Credit Bonus Adder Coin Chute #1 Multiplier COIN/CREDIT Setting Coin Counts AS Multiplier Coins Sequence Setting Bookkeeping Backup RAM Clear Rombd TestClock Setting Game Test ModeGame Test Mode Game Menu Input Test Output Test Force Test Force FeedbackForce ExitInput Assignments GAS Assignments Game Mode Single Game Mode NetworkGame Assignments MPH Default ViewSpeed Display Seat NumberCabinet Type Number of GamePlay Time Driver Select Course SelectBackup Data Clear Adjusting or Replacing the V.R Adjusting the VolumeVR Base Replacing the Volume Greasing Speed Shifter Shift Lever 10 1 Removing the 4-SPEED ShifterPhoto 10 c 10 2 Replacing the Switch 11 1 Adjusting and Replacing the V.R Accelerator & Brake11 2 Greasing Handling the Coin JAM Cleaning the Coin SelectorCoin Selector Coin Insertion TestWELLS-GARDNER Page Optional Dollar Bill Acceptor Coin door shown with optional dollar bill validator inserted Replacing the Fluorescent LAMP, and Lamps Inside the BillboardStart BUTTON,VIEW Change Button Cleaning the Cabinet Surfaces Periodic Inspection TablePage Troubleshooting Problems Cause CountermeasuresCircuit Protector Problems Cause Countermeasures Base Shaker ShakerGame Board 16 1 Removing the Game Board To perform work safely, use 2 or more workers 16 2 Composition of Game Board Game BD NCR17 1 Installation Precautions Communication Play17 2 Connecting the Communication Cable Distance Between MachinesConnect Communication cable Plastic NUT Page Page 17 3 Setting for Communication Play Setting for Communication Play17 4 Cautions to be Heeded During Communication Play Design Related Parts Parts List AC Unit FAN Unit STR-1070 Assy Connector Plate NCR-1080 SW Unit NCR-1150 Assy Ctrl PNL Assy Handle Mecha NCR Handle Base Pedal Unit NCR-2200 Assy ACCEL&BRAKE SPG-2200 Base Assy 4SPEED Shifter NCR-2150 Shift Knob Assy Seat NCR-2400 100 Assy Main BD STD 102 Assy Shield Case NCR NCR-4050 104 Assy AMP BD NCR-4100 106 102 108 Wire Color Code Table Visit OUR Website