Sega 999-1108 owner manual Replacing the Volume

Page 62

REPLACING THE VOLUME

1Disconnect the connector from the Volume.

2Take out 2 screws to remove the Volume together with VR BASE from the HANDLE MECHA.

SCREW (2)

M4 X 12, w/flat & spring washers

PHOTO 9. 1 b

VR BASE

3Take out 2 screws from the VR BASE reverse side to remove the Volume together with VR Bracket from the VR BASE.

4Remove the Volume from VR Bracket and replace.

TRUSS SCREW (2)

M4 X 12

PHOTO 9. 1 c

55

Image 62
Contents Manual no Warranty Before Using the PRODUCT, be Sure to Read the Following Page Table of Contents Specifications Definition of Location Maintenance MAN and Serviceman Locations Maintenance ManHandling Precautions Precautions Concerning Installation Location Limitations of Usage RequirementsOperation Area Precautions to be Heeded Before Starting the Operation OperationPage Page Accessories DescriptionFlex Tube Assy Fiber Cable HOW to USE the Carton BOX Assembling and Installation Ratchet Handle KEY Master Securing in Place Adjuster Adjustment Bottom ViewPower SUPPLY, and Earth Connection AC unitHOW to USE the Cord Clamp Network check screen Memory Test Sound Test Input TestOutput Test Precautions to be Heeded When Moving the Machine Contents of Game HOW to Play Page NAMEENTRYscreen Page Explanation of Test and Data Display Memory InstallationMachine PeriodicSwitch Unit and Coin Meter Switch UnitTest Button Service ButtonSound Volume Coin MeterSystem Test Mode System Test Mode Menu RAM TestJVS Test Option Speaker Left Main Speaker LeftMain Speaker Right 234567890123456789012345678PRESS Test Button to Exit R.T. TestSystem Assignments Service Type COMMON, IndividualCommunication Mode MASTER, SLAVE, RELAY, no Link Cabinet Type 1PLAYER ~ 8PLAYERSCoin Assignments Coin to Credit Bonus Adder Coin Chute #1 Multiplier Manual SettingSetting Example COIN/CREDIT Setting Coin Counts AS Multiplier Coins Sequence Setting Bookkeeping Backup RAM Clear Rombd TestClock Setting Game Test ModeGame Test Mode Game Menu Input Test Output Test Force Test Force FeedbackForce ExitInput Assignments GAS Assignments Game Assignments Game Mode SingleGame Mode Network MPH Default ViewSpeed Display Seat NumberPlay Time Cabinet TypeNumber of Game Driver Select Course SelectBackup Data Clear Adjusting or Replacing the V.R Adjusting the VolumeVR Base Replacing the Volume Greasing Speed Shifter Shift Lever 10 1 Removing the 4-SPEED ShifterPhoto 10 c 10 2 Replacing the Switch 11 1 Adjusting and Replacing the V.R Accelerator & Brake11 2 Greasing Handling the Coin JAM Cleaning the Coin SelectorCoin Selector Coin Insertion TestWELLS-GARDNER Page Optional Dollar Bill Acceptor Coin door shown with optional dollar bill validator inserted Replacing the Fluorescent LAMP, and Lamps Inside the BillboardStart BUTTON,VIEW Change Button Cleaning the Cabinet Surfaces Periodic Inspection TablePage Circuit Protector TroubleshootingProblems Cause Countermeasures Problems Cause Countermeasures Base Shaker ShakerGame Board 16 1 Removing the Game Board To perform work safely, use 2 or more workers 16 2 Composition of Game Board Game BD NCR17 1 Installation Precautions Communication Play17 2 Connecting the Communication Cable Distance Between MachinesConnect Communication cable Plastic NUT Page Page 17 3 Setting for Communication Play Setting for Communication Play17 4 Cautions to be Heeded During Communication Play Design Related Parts Parts List AC Unit FAN Unit STR-1070 Assy Connector Plate NCR-1080 SW Unit NCR-1150 Assy Ctrl PNL Assy Handle Mecha NCR Handle Base Pedal Unit NCR-2200 Assy ACCEL&BRAKE SPG-2200 Base Assy 4SPEED Shifter NCR-2150 Shift Knob Assy Seat NCR-2400 100 Assy Main BD STD 102 Assy Shield Case NCR NCR-4050 104 Assy AMP BD NCR-4100 106 102 108 Wire Color Code Table Visit OUR Website