GE manual Entelli-Switch 250 User Setup SET Menu, Change adjustable values through the SET menu

Page 18

Entelli-Switch 250 User Setup - SET Menu

 

S1

OK

01: 50

 

FRI 31 MAY 2003

MORE

TEST

 

 

 

 

 

1 VAB = ___

2 VAB = ___

VBC = ___

VBC = ___

VCA = ___

VCA = ___

MORE CFG

SET ESC

SET

USER SETUP

Change adjustable values through the SET menu.

Enter six digit access code

(The factory assigned six-digit access code is located on the back of the controller)

 

WARNING

 

 

 

 

 

1 Controller inputs must be relay isolated.

 

 

Voltage

{

4 1413

12 1110

8 7 6

3 2

Network Communications

Customer

 

 

 

 

 

(Option)

Input

 

 

 

 

 

 

 

 

 

 

 

J2*

 

 

 

9

5

1

 

 

 

 

 

 

MOREBACK

—SET SYSTEM CLOCK (pg.14)

—DAYLIGHT SAVINGS ON/OFF

—CLOCK EXERCISER (CDP) (pg.11 & 16)

1PROG 1

2PROG 2

3GRD (Input Sink)

4LS OUT

5NIA OUT

6ELEV. PRE. OUT

7ALARM OUT

8STE OUT

9

10MOTOR DISC. OUT

12TMS IN

13INHIB. > S1

14INHIB. > S2

15LS IN

16

J2-3

N.O.

N.C.

 

To J2/J4 Input

2Controller ouputs have limited source capability. Use only GE Zenith - specified output modules.

 

{

11

5

 

 

 

Output Contacts

12

6

 

1

From J2/J4

 

13

7

R1

2

Output

 

 

 

{

14

8

 

 

 

 

9

 

 

 

Output Contacts

15

 

3

 

10

 

 

 

16

R2

4

J4-3

 

 

 

 

11

 

 

5

 

R1

 

12

 

R1

6

 

Output

 

 

Output

 

 

 

 

13

 

 

7

 

—EXER S2 RUNTIME (CDT) (pg.11 & 15)

—S1 UNDER VOLTAGE (pg.9)

Fail

Restore

—S1 UNDER FREQUENCY (pg.9)

Fail

Restore

—S1 OVER VOLTAGE (pg.12)

*Input and output availability subject to factory configuration.

J4*

1

2

3+12V (Output Source)

4LN OUT

5L4 OUT

6L3 OUT

7L2 OUT

8L1 OUT

9YN IN

10YE IN

11TSNL IN

12Q2/TSL IN

13S12 IN

14S5 IN

 

14

 

8

R2

15

R2

9

Output

 

Output

 

 

16

 

10

Contact Rating: 10A @ 277VAC or 30VDC

Lithium Battery

Exerciser Battery

 

Replacement - K-4100 (BR2032)

 

Service Life - 10 Years+

 

+ During normal operation

User Access Code

Default - 121212

Product Information

www.geindustrial.com

24-Hour Service

(773) 299-6600

Fail

Restore

—S1 OVER FREQUENCY (pg.9)

Fail

Restore

—S2 UNDER VOLTAGE (pg.9)

Fail

Restore

—S2 UNDER FREQUENCY (pg.9)

Fail

Restore

—S2 OVER VOLTAGE (pg.9)

Fail

Restore

—S2 OVER FREQUENCY (pg.9)

Fail

Restore

—SET % PHASE IMBALANCE (VI) FAIL 5%, RESTORE 3% (pg.14)

—SET PHASE IMBALANCE (VI) TIME DELAY 30 seconds (pg.14)

Entelli-Switch 250TM

Figure 10

—TIME DELAY S2 START (P1) (pg.12)

—TIME DELAY S2 STABLE (W) (pg.14)

—LOAD PRESIGNAL TD (T3/W3) (pg.13)

—LOAD DISCONNECT TD (UMD) (pg.13)

—ATS OPEN TIME TO S2 (DW) DELAY units only (pg.11)

—TIME DELAY S1 STABLE (T) (pg.13)

—ATS OPEN TIME TO S1 (DT) DELAY units only (pg.11)

—S2 STOP DELAY (U) (pg.13)

—CALIBRATE S1 (pg.11)

—CALIBRATE S2 (pg.11)

Optional Accessories

18

Entelli-Switch 250 Operation and Maintenance Manual (71R-2000)

GE Zenith Controls

Image 18
Contents GE Zenith Controls Authorized Service Table of ContentsIntroduction Safety / Installation Equipment Inspection and StorageFinal Equipment Inspection Installation cont’d Engine Start Control ConnectionsInitial Energization Initial Energization cont’d R E T E S TInstallation cont’d Entelli-Switch 250 Controller Entelli-Switch 250 ControllerEntelli-Switch 250 Controller cont’d LCD & KeypadUser Setting for Voltage & Frequency Accessory Group Packages Stds Exes Cons Sens Spes PsgsAccessory Definitions A62Calibrate Accessory Definitions cont’d S13P Approximate out of phase degreesS12P S14How to Set the System Clock Press More and scroll to SET System Clock using the More keyPress Bypass Exer CDT One Event Timer ExerciserPress Exer Cancl Press Start Timer Test Press Cancl BpassCDP Clock Exerciser Load / No-Load Clock ExerciserEntelli-Switch 250 User Setup CFG Menu Turn options on or OFF via keypad through the CFG menuEntelli-Switch 250 User Setup SET Menu Change adjustable values through the SET menuEntelli-Switch 250 User Setup System Info View System DataTest Options TestingIntroduction Auto PositionDelayed Transition Testing cont’dATS Testing Standard TransitionClosed Transition Initiating a Closed TransitionRe-Transfer with Closed Transition Emergency Service Procedure for Extended Parallel Time Auto LocationTest Location Sequence of Operation ATS TypeSequence of Operation cont’d Amp Molded Power Section Transformer Usage see Figure Relay/Transformer R/T BoxDelayed / Closed Transition Relay/Transformer R/T Box cont’dStandard Transition R/T Box Schematic Delayed / Closed Transition R/T Box SchematicTroubleshooting and Diagnostics General TroubleshootingTesting Maintenance and TestingInspection and Cleaning ServicingPage GE Zenith Controls