GE Entelli-Switch 250 manual Troubleshooting and Diagnostics, General Troubleshooting

Page 29

Troubleshooting and Diagnostics

DANGER

HAZARDOUS VOLTAGES CAN CAUSE SEVERE INJURY OR DEATH.

These charts may indicate problems that require authorized GE Zenith service personnel.

Hazardous voltages may exist on termination plugs other than those that go into the Entelli-Switch 250.

General Troubleshooting

The following troubleshooting guide is used to recognize, and determine basic faults. When using this guide, it will ask several questions about the condition of the switch.

This guide will then list an order of the possible faults. You will then look at the first suspected fault to determine if it is the problem. If it is not a fault, you go to the

second suspected fault. If you go through all of the suspected faults, or the chart instructs you to, call a GE Zenith Representative for further assistance.

NOTE: When you use the troubleshooting charts, the Annunciation column refers to the LED’s on the control panel.

Symptom

Annunciation

 

Possible Cause(s)

Corrective Action

 

 

 

 

 

 

Engine does not START

SOURCE 2

 

Engine start wires not

Check engine start connections

 

AVAILABLE

 

terminated properly

 

 

LED off

 

 

 

 

 

Generator is in OFF position

Investigate why Engine Control

 

 

 

 

Switch was turned off

 

 

 

 

 

Engine does not stop

LCD Display -

 

U timing cycle not complete

Check U timer setting

 

“TD Engine Cool Down”

 

 

 

 

 

 

 

 

 

SOURCE 1 POSITION, and

 

Engine start wires not

Check Engine Start Connections

 

SOURCE 1 and SOURCE 2

 

terminated correctly

 

 

AVAILABLE LEDs on,

 

 

 

 

 

Generator in MANUAL

Place generator in AUTO

 

but U timer has timed out

 

 

 

 

 

 

 

 

ATS will not transfer

SOURCE 2 AVAILABLE

 

SOURCE 2 voltage or frequency

Check: Engine Start Connections,

to SOURCE 2

LED off

 

not within acceptable parameters

Generator Breaker, Generator Output,

 

 

 

 

and Engine Control Switch

ZTG Series

 

 

 

 

 

 

 

None

 

Power supply connector unplugged

Plug in connector

 

 

 

 

 

 

 

 

LCD Display -

 

W timing cycle not complete

Check W Timer setting

 

“S1 _ _ _ _ TD XFR S1>S2

 

 

 

 

Time Remaining _ _ _ _”

 

 

 

 

 

 

 

 

ATS will not transfer

LCD Display -

DW timing cycle not complete

Check DW Timer setting

to SOURCE 1

“ATS Open

 

 

 

 

Time Remaining _ _ _ _”

 

 

 

ZTGD Series

 

 

 

 

 

 

 

SOURCE 1 AVAILABLE

 

SOURCE 1 voltage or frequency

Check utility and utility breakers

 

 

 

LED off

 

not within acceptable parameters

 

 

 

 

 

 

 

 

 

 

 

None

 

Power supply connector unplugged

Plug in connector

 

 

 

 

 

 

LCD Display -

Limit switch or RT box

Call Technical Services

 

“Diagnostic Code 001”

connector unplugged

 

 

LCD Display -

T timing cycle not complete

Check T Timer setting

 

“S1 OK

 

 

 

 

Time Remaining _ _ _ _

 

 

 

 

Bypass”

 

 

 

 

LCD Display -

TD timing cycle not complete

Check DT Timer setting

 

“ATS Open

 

 

 

 

Time Remaining _ _ _ _”

 

 

 

 

 

 

 

Table 4

GE Zenith Controls

Entelli-Switch 250 Operation and Maintenance Manual (71R-2000)

29

Image 29
Contents GE Zenith Controls Introduction Authorized ServiceTable of Contents Final Equipment Inspection Safety / InstallationEquipment Inspection and Storage Initial Energization Installation cont’dEngine Start Control Connections R E T E S T Initial Energization cont’dInstallation cont’d Entelli-Switch 250 Controller Entelli-Switch 250 ControllerLCD & Keypad Entelli-Switch 250 Controller cont’dUser Setting for Voltage & Frequency Stds Exes Cons Sens Spes Psgs Accessory Group PackagesCalibrate Accessory DefinitionsA62 Accessory Definitions cont’d S12P Approximate out of phase degreesS13P S14Press More and scroll to SET System Clock using the More key How to Set the System ClockPress Exer Cancl Press Start Timer Test CDT One Event Timer ExerciserPress Bypass Exer Press Cancl BpassLoad / No-Load Clock Exerciser CDP Clock ExerciserTurn options on or OFF via keypad through the CFG menu Entelli-Switch 250 User Setup CFG MenuChange adjustable values through the SET menu Entelli-Switch 250 User Setup SET MenuView System Data Entelli-Switch 250 User Setup System InfoIntroduction TestingTest Options Auto PositionATS Testing Testing cont’dDelayed Transition Standard TransitionRe-Transfer with Closed Transition Closed TransitionInitiating a Closed Transition Test Location Emergency Service Procedure for Extended Parallel TimeAuto Location ATS Type Sequence of OperationSequence of Operation cont’d Relay/Transformer R/T Box Amp Molded Power Section Transformer Usage see FigureRelay/Transformer R/T Box cont’d Delayed / Closed TransitionDelayed / Closed Transition R/T Box Schematic Standard Transition R/T Box SchematicGeneral Troubleshooting Troubleshooting and DiagnosticsInspection and Cleaning Maintenance and TestingTesting ServicingPage GE Zenith Controls