GE Entelli-Switch 250 manual How to Set the System Clock

Page 14

Accessory Definitions (cont’d)

VI

Voltage Imbalance (Three Phase)

For a three phase source, this feature monitors phase voltage ratios based on a selected range within a selected time window. Should any phase fall below the selected lower window limit or exceed the selected higher window limit within the selected time frame, the controller initiates transfer to the other source.

Range: 5% to 20% of Nominal voltage,

10 to 30 seconds window, user adjustable. Resolution: 1% Increments

Minimum Differential: 2% between “Fail” and “Restore” settings.

Factory default: 10% “Fail”, 8% “Restore”, 30 Seconds. See CFG Menu page 17 to configure ON or OFF.

See SET Menu page 18 to set Percentage and time windows

W

Time Delay (S2) Source 2 Stable Timer. To delay trans- fer to Source 2. Adjustable 0-5 minutes in 1 second increments. Standard setting is 1 second. Adjust via SET menu (see page 18)

YEN

Bypass Timers Key utilizing Keypad. When applicable, the system prompts the user to press a button to bypass

(T) or (W) Timers should the user so desires.

ZNET

Network Communications Interface Card

How to Set the System Clock

How to Set the System Clock

Set System Clock, time and date

·If the clock is not set, the display will show SET SYSTEM CLOCK on the second line of the S1 OK screen.

·The S1 OK screen will show time (hours and minutes) on the second line if the system clock has been set. (Date on third line)

Setting the System Clock

(Start from S1 OK screen)

1.Remove battery protective white plastic strip near P relay. *

2.Press MORE then press SET.

3.Press MORE and scroll to SET SYSTEM CLOCK using the MORE key.

4.Press SEL.

5.ENTER ACCESS CODE located on the white label on the back of the controller.

6.Press SEL.

7.Use the up and down keys to change the hour value.

8.Press SAVE (this will enter this value and move cursor to minutes).

9.Use the up and down keys to change the minutes.

10.Press SAVE (this will enter this value and move cursor to month).

11.Use the up and down key up to change the month.

12.Press SAVE (This will enter this value and complete the clock setting).

13.Use the up and down keys to change the date.

14.Press SAVE (this will enter this value and move cursor to year).

15.Use the up and down keys to change year.

16.Press SAVE (this will enter this value and compete the clock setting).

17.To edit settings, press SEL and repeat steps 6-16.

18.If the setting is satisfactory, press MORE (unit then returns to the SET menu then press BACK, then ESC.)

*Replacement battery part #K-4100

Battery will last 5 years and provides power to retain clock function only (Controller functions without battery).

14

Entelli-Switch 250 Operation and Maintenance Manual (71R-2000)

GE Zenith Controls

Image 14
Contents GE Zenith Controls Introduction Authorized ServiceTable of Contents Final Equipment Inspection Safety / InstallationEquipment Inspection and Storage Initial Energization Installation cont’dEngine Start Control Connections Initial Energization cont’d R E T E S TInstallation cont’d Entelli-Switch 250 Controller Entelli-Switch 250 ControllerEntelli-Switch 250 Controller cont’d LCD & KeypadUser Setting for Voltage & Frequency Accessory Group Packages Stds Exes Cons Sens Spes PsgsCalibrate Accessory DefinitionsA62 Accessory Definitions cont’d S13P Approximate out of phase degreesS12P S14How to Set the System Clock Press More and scroll to SET System Clock using the More keyPress Bypass Exer CDT One Event Timer ExerciserPress Exer Cancl Press Start Timer Test Press Cancl BpassCDP Clock Exerciser Load / No-Load Clock ExerciserEntelli-Switch 250 User Setup CFG Menu Turn options on or OFF via keypad through the CFG menuEntelli-Switch 250 User Setup SET Menu Change adjustable values through the SET menuEntelli-Switch 250 User Setup System Info View System DataTest Options TestingIntroduction Auto PositionDelayed Transition Testing cont’dATS Testing Standard TransitionRe-Transfer with Closed Transition Closed TransitionInitiating a Closed Transition Test Location Emergency Service Procedure for Extended Parallel TimeAuto Location Sequence of Operation ATS TypeSequence of Operation cont’d Amp Molded Power Section Transformer Usage see Figure Relay/Transformer R/T BoxDelayed / Closed Transition Relay/Transformer R/T Box cont’dStandard Transition R/T Box Schematic Delayed / Closed Transition R/T Box SchematicTroubleshooting and Diagnostics General TroubleshootingTesting Maintenance and TestingInspection and Cleaning ServicingPage GE Zenith Controls